E-mail Address
(User-id)
Password
Forgot your userid or password?
EBSS Home
Register as a New User
Search for:
Solicitations
Bid Results
Supplier Postings
Category List
Small Business Certification for the SEED Program
Home
Print
Help
Solicitations
Solicitation Number :
*
170216.MGT
Solicitation Status :
Closed
Solicitation Title :
PRESSURIZATION PLANT FOR STATION E SUBSTATION
PP Name :
Mark Tsumura
Phone :
916-732-6137
Email :
mtsumur@smud.org
Summary
Documents
Electronic Bid
Bidder Info
Supplier Postings
High Level Category Group(s) :
Material, Equipment, Supplies
Help
Category(s) :
Electrical, Substation Equipment ;Fabricated Items ;Power Plant Equipment/Accessories for Large Electrical Generation Power Plants ;Pumps ;Substation Material
Map to Bid Opening :
Type :
BR - Materials (Bid Request)
Department :
Distribution Services
Broad Class :
Commodities
Deadline Date:
11/7/2017
Time:
2:00 PM
Est. Amount :
$1,500,000.00
Duration :
Work Location :
Licenses Required :
Description :
BID REQUEST FOR THE PURCHASE OF A PRESSURIZATION PLANT AND ON-SITE INSTALLATION/COMMISSIONING WORK FOR SMUD SUBSTATION E. PRESSURIZATION PLANT WILL BE DESIGNED, FABRICATED, ASSEMBLED, TESTED AND DELIVERED IN ACCORDANCE WITH SMUD ENGINEERING SPECIFICATION STE-FPP, REVISION 2, DATED 11/30/2016. DOWNLOAD BID AND ALL ATTACHED DOCUMENTATION AND SPECIFICATIONS AND SUBMIT COMPLETED BID AND REQUIRED DOCUMENTS BY BID DEADLINE. QUOTE FOB DESTINATION PREPAY AND ALLOW (INCLUDE ALL SHIPPING COSTS) TO DELIVERY SITE AS SPECIFIED. CONFIRM ADVISE DELIVERY LEAD TIME . SMUD TECHNICAL CONTACT: INNA LITVINCHUK (916-732-6657).
Tech Contact :
Inna Litvinchuk
Phone :
(916)732-6657
Email :
ILitvin@smud.org
Pre Bid Conference:
No
Date :
Time :
Conference Attendance:
Location:
Address:
Instructions:
Help
Click on link to view a specific solicitation document or select checkboxes and then click (Download) to save selected files on your computer
Description
File Format
Document Type
Select
All Solicitations
BID REQUEST 170216.MGT
Adobe PDF
Solicitation
All Drawing
SMUD ENGINEERING SPECIFICATION W001, REV 9, DATED 02/02/2006
Adobe PDF
Drawing
SMUD TECHNICAL SPECIFICATION SS1009, REV 5, DATED 05/09
Adobe PDF
Drawing
SMUD TECHNICAL SPECIFICATION STE-FPP, REV 2, DATED 11/30/16
Adobe PDF
Drawing
STE-PLANT LAYOUT, REV 0
Adobe PDF
Drawing
STE-PLANT PIPING, REV 0
Adobe PDF
Drawing
All MISC
CA TAX FORM 587
Adobe PDF
MISC
CA TAX FORM 590
Adobe PDF
MISC
W-9
Adobe PDF
MISC
All Bid Results
INTENT TO AWARD/BID ABSTRACT
Adobe PDF
BidResults
PRELIMINARY BID RESULTS
Adobe PDF
BidResults
Help
Electronic Bidding is not available for this solicitation. Please see the solicitation documents for instructions on how to respond.
Help
Edit Column
Delete Column
Company Name
Contact
City/State
Phone Number
Email
SEED Verified
Edit
Delete
PRIME VENDOR, INC.
Not Available
Not Available
Not Available
Not Available
Edit
Delete
Bid Ocean
Not Available
Not Available
Not Available
Not Available
Edit
Delete
Ryan Process
Stephen Alton
Benicia,
925-837-0670
steve@ryanprocess.com
Edit
Delete
Doug Veerkamp General Engineering, Inc.
Diana Garrido
Placerville,
530-676-0825
diana.garrido@dougveerkamp.com
Edit
Delete
NMI Industrial Holdings
Majid Rahimian
Sacramento,
916-635-7030
bids@nmiindustrial.com
Edit
Delete
The DySyn Group
Jeffrey Mader
North Highlands,
530-830-0083
NorCalBids@dysyngroup.com
Edit
Delete
GE Grid Solutions
Paul Uppal
San Ramon,
925-334-2408
paul.uppal@ge.com
Edit
Delete
Brahma Group Inc
Bruce Arthur
,
801-367-3420
brucea@brahmagroupinc.com
1 of 6 Prev
Next
Help
You must log in to create or edit postings.
Edit Column
Delete Column
Company Name
Contact
Reason
Date Added
Posting Due Date
Edit
Delete
ALL VALLEY ENGINEERING
Nevin Gill
SEED Sub seeking Prime Contractor
9/21/2017 10:44:28.990 AM
9/28/2017 5:00:00 PM
Edit
Delete
Coruscating Images
anthony occhipinti
SEED Sub seeking Prime Contractor
10/9/2017 2:49:37.63 PM
10/16/2017 5:00:00 PM
Edit
Delete
On Point Drone Services, LLC
Scott Ruchek
Supplier Seeking Prime/Sub Contractor(s)
10/11/2017 10:28:24.193 AM
12/31/2017 5:00:00 PM
Edit
Delete
ALL VALLEY ENGINEERING
Nevin Gill
SEED Sub seeking Prime Contractor
10/16/2017 4:34:02.930 PM
11/28/2017 5:00:00 PM
Edit
Delete
ALL VALLEY ENGINEERING
Nevin Gill
SEED Sub seeking Prime Contractor
1/25/2018 10:46:32.280 AM
2/1/2018 5:00:00 PM