Doc4087506649
RFP for Substation Construction Services
Show description Hide description
This RFP solicits proposals for Substation Construction Services from Contractors pre-qualified through RFQ No. Doc4026185446. <strong><span style="background-color: rgb(255, 255, 0);">Please click "Respond to Posting" and follow instructions to log-in and register. This will provide access to the documents. If you click "Respond to Posting" before the live date, you will receive an error message.</span></strong> <span style="font-weight: bold; background-color: rgb(255, 255, 0);"><span style="text-decoration-line: underline;">NOTE</span>: Documents for this RFP will be available once the solicitation is live. Estimated to be 7/11/23.</span>
Services 07/06/2023 09/08/2023
Doc4093798372
RFP for Generation, Distribution and Transmission Power Transformers
Show description Hide description
<strong>RFP for Generation, Distribution and Transmission Power Transformers </strong> <span style="font-size:11.0pt;line-height:115%; font-family:&quot;Calibri&quot;,sans-serif;mso-ascii-theme-font:minor-latin;mso-fareast-font-family: Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-theme-font:minor-latin; mso-bidi-font-family:Arial;mso-bidi-theme-font:minor-bidi;mso-ansi-language: EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting be fore the Live on Date you will receive an error.</span>
Materials 07/13/2023 10/23/2023
Doc4102512538
IFB FOR 59TH STREET DEMOLITION SERVICES - PHASE 2
Show description Hide description
<p class="MsoBodyText" style=" tab-stops:1.0in"><span style="font-size: small; font-family: arial, helvetica, sans-serif;">SMUD is seeking qualified Contractors to provide Site and building demolition of SMUD’s previous corporation yard which is approximately 16 acres on the north side of the light rail tracks and 4 acres which are south of the light rail tracks. Multiple buildings are on each location and the site work generally includes demolition of parking lot lights, loading ramps, equipment racks, tall concrete curbs, and misc. site structures such as a wood chip bin and covered material bins. </span></p><span style="font-size: small; font-family: arial, helvetica, sans-serif;"> </span><span style="font-size: small; font-family: arial, helvetica, sans-serif;">Services are needed by approximately November 1, 2023, and the resulting contract will run for approximately 1 year. </span> <span style="font-size: small; font-family: arial, helvetica, sans-serif;"> </span><span style="font-size: small; font-family: arial, helvetica, sans-serif;">SMUD intends to award one contract to the lowest evaluated Bidder as a result of this solicitation. </span> <span style="font-size: small; font-family: arial, helvetica, sans-serif;"> </span><span style="font-size: small; font-family: arial, helvetica, sans-serif;">The Prime Bidder must demonstrate in their bid that they meet the following PASS/FAIL requirement. Failure to meet this requirement will result in SMUD declaring the Bid non-responsive. </span> <p class="MsoListParagraph" style="text-indent:-.25in;mso-list:l0 level1 lfo1"><span style="font-size: small; font-family: arial, helvetica, sans-serif;"> A.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;"> </span> Prime Bidder must attend the mandatory Pre-Bid Conference and site visit to ensure a complete understanding of the details of this Invitation for Bid. Attendance will be verified by the Pre-Bid Conference sign-in sheet. </span></p><p class="MsoBodyText" style=" text-indent:-.25in;mso-list:l0 level1 lfo1"><span style="font-size: small; font-family: arial, helvetica, sans-serif;"> B.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;"> </span> Contractor must possess a current California Contractor’s License in ALL of the following classes: The general contractor will have an A, C21 and C22 licenses at the time of bid. </span></p><span style="font-family: arial, helvetica, sans-serif;"> <span style="background-color: rgb(255, 255, 46);"> <strong><span style="font-size: 12pt;">*DOCUMENTS WILL BE AVAILABLE FOR DOWNLOAD ON AUGUST 24, 2023 after 3PM PST*</span></strong></span><span style="font-size: 12pt;"><span style="background-color: rgb(255, 255, 46);"> </span> <strong>PLEASE CLICK 'RESPOND TO POSTING' AND FOLLOW INSTRUCTIONS TO LOGIN AND REGISTER. THIS WILL PROVIDE ACCESS TO THE DOCUMENTS.</strong></span></span> <table width="100%" cellspacing="0" cellpadding="0" border="0" style="font-family: &quot;72&quot;, Arial, Helvetica, sans-serif; color: rgb(102, 102, 102); font-size: 14px; font-weight: 700;"> <tr> <td class="postingSummaryItemPadding" style="color: rgb(0, 0, 0); font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-weight: normal; font-stretch: normal; line-height: normal; padding-bottom: 5px;"><font size="2">https://discovery.ariba.com/rfx/16990325</font></td> </tr> </table>
Services 08/23/2023 09/19/2023
Doc4167980300
4721U - VO9 CHIPPER TOWABLE
Show description Hide description
This solicitation will be available on Tuesday, August 29, 2023. Responses will not be accepted through event messages or email.
Services 08/28/2023 09/15/2023
Doc4169354299
4722U - VO9 CHIPPER TOWABLE
Show description Hide description
4722U - VO9 CHIPPER TOWABLE Reponses will not be accepted through event messages or email.
Services 08/29/2023 09/15/2023
Doc4171885766
AERIAL PHOTOGRAPHY SERVICES
Show description Hide description
This project will utilize drones to obtain high-definition 100-megapixel photos of all components of approximately 1500 transmission structures within Sacramento County, and a portion of South Placer County. The photos will be taken from multiple angles, multiple elevations, and focus on insulators, connectors, splices, structure body and other components. The drones will also take photos of surrounding terrain and transmission structure footings and Right-of-Way (ROW). Additionally, the contractor will submit to SMUD Contract Manager and third-party reviewer all high-resolution images in electronic format with metadata in a SMUD defined file naming convention.
Other 08/30/2023 09/21/2023
Doc4485717766
RFP for Construction Services for Renewable Assets
Show description Hide description
RFP for Construction Services for Renewable Assets
Materials 06/24/2024 07/25/2024
Doc4510063265
Integrated Vegetation Management
Show description Hide description
Request for Proposals for Integrated Vegetation Management <p class="Sub-bulletCxSpFirst"><strong>DOCUMENTS FOR THIS RFP WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON OR ABOUT MAY 16, 2024</strong></p> Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.
Other 05/12/2024 06/13/2024
Doc4563653337
RFP for Cable Replacement Construction Services
Show description Hide description
<p class="MsoBodyText" style=" ">The Contractor shall furnish all supervision, labor, equipment and incidentals necessary to accomplish the work in accordance with the Contract.<span style="mso-spacerun:yes"> </span>The Contractor shall employ personnel that can use circuit prints to install conduit according to SMUD job design. The work generally consists of: </p> <p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt &quot;Times New Roman&quot;"> </span></span></span> Earthsaw/Rocksaw excavation in either concrete or asphalt pavement. </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt &quot;Times New Roman&quot;"> </span></span></span> Installation of PVC Conduit. </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt &quot;Times New Roman&quot;"> </span></span></span> Backfill, compaction, slurry/concrete, and repaving. </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt &quot;Times New Roman&quot;"> </span></span></span> Tunnel notches. </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt &quot;Times New Roman&quot;"> </span></span></span> Excavation of intercept | tie in | conduit pits and installation of pull boxes (concrete/horticultural, lawn and cultivated areas) </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt &quot;Times New Roman&quot;"> </span></span></span> Grinding asphalt pavement in compliance with the applicable local agency specifications where work is to be performed. </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt &quot;Times New Roman&quot;"> </span></span></span> Trench excavation. </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt &quot;Times New Roman&quot;"> </span></span></span> Roadway resurfacing. </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt &quot;Times New Roman&quot;"> </span></span></span> Boring horizontal holes in various types of earth formations, such as, sand, rock, clay, hardpan, loam, etc. </p> <p class="MsoBodyTextFirstIndent" style="text-align:justify;text-indent:0in">The work on this contract consists of numerous individual jobs, which will be assigned as the need arises.<span style="mso-spacerun:yes"> </span>Work will be Task Released to the Contractor and assigned in the form of a "Purchase Order (PO)”.<span style="mso-spacerun:yes"> </span>Each PO will be a separate/complete project.<span style="mso-spacerun:yes"> </span>The Contractor shall complete each PO before physical construction (breaking ground) on another PO, unless approved by the Contract Manager. </p> <p class="MsoBodyTextFirstIndent" style="text-align:justify;text-indent:0in">The intent of these specifications is to describe the work and to provide appropriate pay items.<span style="mso-spacerun:yes"> </span>Some of the items and quantities in the Bid Schedule may not be utilized.<span style="mso-spacerun:yes"> </span>Others may only be partially used or may be exceeded.<span style="mso-spacerun:yes"> </span>No adjustment of unit prices will be made for under-runs or over-runs of the quantities listed in the Bid Schedule.<strong style="mso-bidi-font-weight:normal"> </strong></p> <strong style="background-color: rgb(255, 255, 0);">Please click "Respond to Posting" and follow instructions to log-in and register. This will provide access to the documents. If you click respond to posting before the Live date, you will receive an error message. </strong> <strong style="background-color: rgb(255, 255, 0);"> </strong> <span style="font-weight: bold; background-color: rgb(255, 255, 16);">NOTE: Documents for this RFP will be available once the solicitation is live. Estimated to be 5/24/24. </span>
Services 05/22/2024 07/15/2024
Doc4565097955
BR for Mobile Surveillance Trailers
Show description Hide description
Purchase of (2) mobile surveillance trailers for IT PMO. See technical specs for detailed information. <span class="NormalTextRun SCXW134609168 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">DOCUMENTS FOR THIS RF</span><span class="NormalTextRun SCXW134609168 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">x</span><span class="NormalTextRun SCXW134609168 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;"> WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 5/15/2024</span> <span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">Please</span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;"> click </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">‘</span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">Respond to Posting</span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">’</span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;"> </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">and</span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;"> </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">follow instructions to login and register. This will provide </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">access </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">to </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">the documents.</span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;"> </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">If you click respond to posting </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">before</span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;"> the Live on Date you will receive an error.</span>
Materials 05/01/2024 06/14/2024
Doc4575183223
RFP Wood Cross Arms
Show description Hide description
RFP Wood Cross Arms <p class="Sub-bulletCxSpFirst" style="mso-list:l0 level2 lfo1"><span style="font-family:&quot;Courier New&quot;;mso-fareast-font-family:&quot;Courier New&quot;"><span style="mso-list:Ignore">o<span style="font:7.0pt &quot;Times New Roman&quot;"> </span></span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 05/13/2024. </p> <p class="Sub-bulletCxSpLast" style="mso-list:l0 level2 lfo1"><span style="font-family: &quot;Courier New&quot;;">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.</p>
Materials 05/07/2024 06/21/2024
Doc4580729117
RFP GPO Station Recoating Project
Show description Hide description
RFP GPO Station Recoating Project
Const 05/10/2024 06/28/2024
Doc4585979980
RFP for General Line Construction and Pole Replacement Services
Show description Hide description
<span style="font-weight: bold;">RFP for General Line Construction and Pole Replacement Services.</span> <span style="font-weight: bold;"> </span> <strong style="background-color: rgb(255, 255, 0);">Please click "Respond to Posting" and follow instructions to log-in and register. This will provide access to the documents. If you click respond to posting before the live date, you will receive an error message. Live date estimated to be 6/12/24.</strong>
Const 06/12/2024 07/18/2024
Doc4601524833
WORKER'S COMPENSATION THIRD PARTY CLAIMS ADMINISTRATION SERVICES
Show description Hide description
SMUD is seeking a qualified Claim Service Provider to provide complete WC TPA services. SMUD is looking for a TPA partnership that will deliver objective and measurable results that will reduce the cost and duration of WC claims, provide claims processing in a timely and professional manner, actively pursue subrogation and insurance recovery, assist in returning injured employees back to work, and maintain strong communications with the injured worker and SMUD.SMUD intends to award one contract commencing January 1, 2025, for a five (5) year period with two 1-year options to extend for services described in this Request for Proposal.
Services 05/23/2024 07/12/2024
Doc4612220459
RFI - DISTRIBUTIONS TRANSFORMERS
Show description Hide description
RFI - DISTRIBUTIONS TRANSFORMERS <p style=" ">The Sacramento Municipal Utility District (“SMUD”) is seeking information from suppliers on their processes, capabilities, and approaches to manufacturing and providing Distribution Transformers. SMUD hopes to gather information from, build relationships with, and potentially enter into agreements with suppliers such that it can increase the resiliency of its electric grid in the face of severe weather events. The questions included in the RFI will help SMUD understand the existing processes, capabilities, and constraints of Distribution Transformer manufactures and suppliers. </p>
Materials 05/30/2024 06/21/2024
Doc4612227198
BR S and C Circuit Switchers
Show description Hide description
BR S and C Circuit Switchers <p class="Sub-bulletCxSpFirst" style="mso-list:l0 level2 lfo1"> <span style="font-family:&quot;Courier New&quot;;mso-fareast-font-family:&quot;Courier New&quot;"><span style="mso-list:Ignore">o<span style="font:7.0pt &quot;Times New Roman&quot;"> </span></span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 6/3/2024. <span style="mso-spacerun:yes"> </span></p> <p class="Sub-bulletCxSpLast" style="mso-list:l0 level2 lfo1"><span style="font-family: &quot;Courier New&quot;;">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.’ <span style="background:yellow; mso-highlight:yellow"> </span></p>
Materials 05/30/2024 06/20/2024
Doc4621886315
Vegetation Management Utility Line Clearance RFP
Show description Hide description
The work generally consists of performing right-of-way maintenance work on SMUD’s Transmission and Distribution Systems on a task order basis. This RFP will open the week on June 17, 2024. Please wait for the RFP to open to submit questions.
Other 06/14/2024 07/26/2024
Doc4641888603
BR for Needlepoint Bipolar Ionization System
Show description Hide description
BR for Needlepoint Bipolar Ionization System <span class="ui-provider a b c d e f g h i j k l m n o p q r s t u v w x y z ab ac ae af ag ah ai aj ak"><ul><li>DOCUMENTS FOR THIS BR WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON June 21, 2024. ‘ </li><li>‘Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting be fore the Live on Date you will receive an error.’</li></ul></span>
Materials 06/21/2024 07/02/2024
Doc4641921285
UARP Reservoir Bathymetric Surveys
Show description Hide description
Sacramento Municipal Utility District owns and operates the reservoirs listed below. The reservoirs are formed by dams and used for hydroelectric power generation. SMUD calculates the amount of water in storage for a variety of operational and regulatory requirements by measuring the water surface elevation. An important parameter in this calculation is the relationship between contents and water surface elevation. To this end, SMUD requires surveys of the bathymetry of these reservoirs. These reservoirs are in the Sierra Nevada, El Dorado County, California, west of Lake Tahoe, on the American River watershed. All have boat ramps and are accessible year-round using paved or well-graded gravel roads. Each boat ramp, with one exception, is publicly accessible over US Forest Service or county roads. Reservoirs are generally held nearly full year-round. They are long and narrow, at the bottom of canyons. Attachment 1 has sketch maps of each reservoir, with UTM grid location, a scale bar, and symbols identifying the dam and boat ramp.SMUD calculated bathymetry when designing the dams forming these reservoirs. SMUD made bathymetric measurements and calculations in 1999, and at two of the reservoirs, additional bathymetric measurements.
Other 06/18/2024 07/11/2024
Doc4643661542
RFP for Street Light Installation and Maintenance Services
Show description Hide description
<strong style="background-color: rgb(255, 255, 255);">RFP for Street Light Installation and Maintenance Services.</strong> <strong style="background-color: rgb(255, 255, 255);"> </strong> <strong style="background-color: rgb(255, 255, 0);">Please click "Respond to Posting" and follow the instructions to log-in and register. This will provide access to the documents. If you click </strong> <strong style="background-color: rgb(255, 255, 0);">respond to posting before the live date, you will receive an error message. </strong> <strong style="background-color: rgb(255, 255, 0);">Live date estimated to be 7/2/24. </strong>
Const 07/01/2024 07/29/2024
Doc4651126766
RFP Transmission and Substation Steel Contract
Show description Hide description
RFP Transmission and Substation Steel Contract <p class="Sub-bulletCxSpFirst"> <span style="font-family:&quot;Courier New&quot;;mso-fareast-font-family:&quot;Courier New&quot;">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 6/24/2024.</p><span style="font-family: &quot;Courier New&quot;;">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.
Other 06/24/2024 07/16/2024
Doc4653178660
BR TRANSFORMER BUSHINGS 230KV and 69KV
Show description Hide description
BR TRANSFORMER BUSHINGS 230KV and 69KV <p class="Sub-bulletCxSpFirst"> <span style="font-family:&quot;Courier New&quot;;mso-fareast-font-family:&quot;Courier New&quot;">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 6/27/2024. </p><span style="font-family: &quot;Courier New&quot;;">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.’
Materials 06/25/2024 07/16/2024
Doc4658405845
CONSULTING SERVICES FOR FEDERAL DISASTER ASSISTANCE AND FEMA GRANTS
Show description Hide description
FEDERAL DISASTOR ASSISTANCE &amp; FEMA GRANTS Since 2018, SMUD has pursued several FEMA grant opportunities under the Hazard Mitigation Grant Program (HMGP) and the Building Resilient Infrastructure and Communities Program (BRIC). Grant applications have focused on projects to upsize culverts, reduce hazardous wildfire fuels, harden distribution line infrastructure, and prepare Local Hazard Mitigation Plans. · UARP Culvert System Upsizing (DR4382)· Wildland Fire Mitigation through Fuels Reduction – Sacramento (DR4382)· Wildland Fire Mitigation through Fuels Reduction – El Dorado (DR4382)· PCA Fire Hardening Project (DR4407)· SMUD Microgrid Scoping (BRIC)· SMUD Local Hazard Mitigation Plan (2018)· SMUD Local Hazard Mitigation Plan (2023) To date, SMUD staff have prepared the materials required for the above grant sub applications. In preparing the sub applications SMUD staff have worked extensively with the California Office of Emergency Services (CalOES) as well as FEMA in a variety of capacities including responding to requests for information, providing supporting documentation, and negotiating with other agencies, such as the U.S. Fish and Wildlife Service relative to meeting FEMA’s responsibilities under the National Environmental Policy Act. This RFP is a continuation of those efforts.
Services 06/27/2024 07/25/2024
Doc4677714715
BR SWGR PDMT 21KV NOVEC 2-600A SW 2-600A
Show description Hide description
BR SWGR PDMT 21KV NOVEC 2-600A SW 2-600A <p class="Sub-bulletCxSpFirst"> <span style="font-family:&quot;Courier New&quot;;mso-fareast-font-family:&quot;Courier New&quot;">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON July 12, 2024. </p><span style="font-family: &quot;Courier New&quot;;">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.
Materials 07/09/2024 08/02/2024
Doc4686748826
GENERAL ARCHITECTURAL AND ENGINEERING SERVICES
Show description Hide description
The work to be performed under this Contract will be done at SMUD's facilities at various locations generally within Sacramento County, California. These facilities are located at the SMUD Main Campus on S Street; 59th Street Corporation Yard; Folsom Boulevard Yard Campus (located behind the S Street Campus); East Campus Operation Center (located on South Bradshaw Road); Fresh Pond facilities located east of Pollock Pines, California; Rancho Seco Complex located in Herald, California; Solano Wind Project O&amp;M Headquarters located in Rio Vista, California; and various SMUD electrical substations and any property owned or leased by SMUD. Each bidder is expected to visit the SMUD sites before task bidding to become thoroughly familiar with the nature and location of SMUD Facilities, the general and local conditions, including jobsite topography and ground conditions. Call the SMUD Engineer listed on the RFTP to arrange for site access necessary.
Services 07/16/2024 08/13/2024
Doc4702877830
BR for MAC-TS4
Show description Hide description
Ordering a MAC-TS4 vacuum testing system. DOCUMENTS FOR THIS BR WILL BE AVAILABLE ONCE THE SOLICIATION IS LIVE ON [July 25th]. Please click "Respond to Posting" and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.
Materials 07/24/2024 08/07/2024
Doc4704901930
Computer-Aided Dispatch (CAD) Solution
Show description Hide description
NOTICE: This RFP is scheduled for release on Thursday, August 1, 2024. The RFP and associated documents will be available for viewing and download after this date. SMUD is seeking a qualified firm to provide a computer aided dispatch solution, associated implementation and integration services, and support for the solution for five (5) years.
IT 07/25/2024 09/30/2024
Doc4726315189
RFQ for Energy Efficient Products
Show description Hide description
RFQ for Energy Efficient Products. <span style="text-align: justify;">This is a “Sheltered Market” procurement solicitation, under Sacramento Municipal Utility District’s (SMUD) Supplier Education &amp; Economic Development (SEED) Program.</span><span style="text-align: justify;"> </span><span style="text-align: justify;">It is available only to SEED Program qualified suppliers having California Department of General Services (DGS) certification and SMUD customer qualification.</span><span style="text-align: justify;"> </span><span style="text-align: justify;">See SEED Program Qualification on Page 7 for detailed requirements.</span>
Materials 08/08/2024 08/20/2024
Doc4728470881
BR for VC4 BOX TRUCK 4X2E
Show description Hide description
DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON AUGUST 9th, 2024. Please click 'Respond to Posting" and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error. Purchase of one (1) Rizon electric box truck to the specs in the attached print.
Services 08/08/2024 08/26/2024
Doc4728706183
BR for VC2 SUV 4X4E (Blazer EV)
Show description Hide description
DOCUMENTS FOR THIS BR WILL BE AVAILABLE ONCE THE SOLICITATION IS LOVE ON AUGUST 9th, 2024. Please click 'Respond to Posting' and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error. Fleet procurement of (5) Chevy Blazer EVs
Materials 08/08/2024 08/27/2024
Doc4730889978
RENEWABLE ENGINEERING SERVICES
Show description Hide description
SMUD has a goal to reach Zero Carbon by 2030. To support SMUD’s continued and increasing need to procure sources of renewable energy, SMUD’s Power Generation Project Development organization is developing several Solar, Energy Storage Systems (ESS) and Wind projects, and may have other technologies that we explore development of during the contract term. These projects are in various stages from ideation, planning, design, and construction. SMUD seeks services to support each project from ideation, planning, design, construction, commissioning, operations and maintenance, through end-of-life (including demolition or repowering as permitted). SMUD owns, administers and/or operates a variety of utility scale renewable energy facilities. SMUD currently owns and operates a 300 MW, 103-unit wind farm in the Collinsville-Montezuma Hills Wind Resources Area (Vestas V150 and V90 turbines) on 5,900 acres that includes three distinct projects (known as Solano Phase 2, Phase 3, and Phase 4 (Solano 4). SMUD is currently in the process of developing a project to replace end of life turbines, known as the Solano Wind Phase 5 (or Solano 5) Project. The existing projects are connected by a combination of 21kV underground transitioning to overhead lines and 34.5 kV underground collection systems that connect to the Russell Substation. Solano wind farm facilities also include an on-site operations and maintenance (O&amp;M) warehouse and shop, oil storage buildings, and office building, which are steel frame structures with fire detection systems. The wind plant (turbines and associated Balance of Plant (BOP)) is operated and maintained on SMUD’s behalf by an O&amp;M contractor.
Services 08/09/2024 09/05/2024
Doc4738157220
BR UARP 1600A and 800A CIRCUIT BREAKERS
Show description Hide description
BR UARP 1600A and 800A CIRCUIT BREAKERS <p class="Sub-bulletCxSpFirst"> <span style="font-family:&quot;Courier New&quot;;mso-fareast-font-family:&quot;Courier New&quot;">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 08/16/2024.</p> <span style="font-family: &quot;Courier New&quot;;">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.
Materials 08/14/2024 09/13/2024
Doc4739422027
BR S and C VISTA UNDERGROUND SWITCHGEAR SF6
Show description Hide description
BR S and C VISTA UNDERGROUND SWITCHGEAR SF6 <p class="Sub-bulletCxSpFirst"> <span style="font-family:&quot;Courier New&quot;;mso-fareast-font-family:&quot;Courier New&quot;">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 08/19/2024.</p> <span style="font-family: &quot;Courier New&quot;;">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.’
Materials 08/15/2024 08/26/2024
Doc4739448267
BR S and C VISTA PADMOUNT SWITCHGEAR SF6
Show description Hide description
BR S and C VISTA PADMOUNT SWITCHGEAR SF6 <p class="Sub-bulletCxSpFirst"> <span style="font-family:&quot;Courier New&quot;;mso-fareast-font-family:&quot;Courier New&quot;">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 08/20/2024. </p><span style="font-family: &quot;Courier New&quot;;">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.’
Materials 08/15/2024 08/27/2024
Doc4739908681
BUSHING 115KV TRANSFORMER
Show description Hide description
BUSHING 115KV TRANSFORMER THIS SOLICITATION WILL BE AVAILABLE WHEN IT IS LIVE ON AUGUST 16, 2024.
Materials 08/15/2024 08/26/2024
Doc4739943721
BR EATON BREAKER 13.8KV (VACUUM BREAKER)
Show description Hide description
BR <a target="_blank" target="_blank" style="text-align: center;">EATON BREAKER 13.8KV (VACUUM BREAKER)</a><p align="center" style="text-align:center;mso-hyphenate:none; tab-stops:center 3.75in"><a><strong> </strong></a></p> <p class="Sub-bulletCxSpFirst"> <span style="font-family:&quot;Courier New&quot;;mso-fareast-font-family:&quot;Courier New&quot;">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 08/03/2024.</p> <span style="font-family: &quot;Courier New&quot;;">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.’
Materials 08/15/2024 09/04/2024
Doc4746858437
Photography and Videography Surplus Sale
Show description Hide description
Photography and Videography Surplus Sale
Other 08/20/2024 09/03/2024
Doc4751209814
WORKFORCE SOFTWARE APPLICATION MANAGED SERVICES
Show description Hide description
DOCUMENTS FOR THIS RFP WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON AUGUST 23, 2024. <span style="font-family: Calibri, sans-serif; font-size: 11pt;">Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click "Respond to Posting"</span> <span style="font-family: Calibri, sans-serif; font-size: 11pt;">before the AUGUST 23, 2024, you will receive an error.</span> The purpose of this RFP is to seek a single WorkForce Software (“WFS”) certified/authorized Application Managed Services Provider (“AMS Provider”) to provide professional services to enhance and sustain SMUD’s WFS Time and Attendance business applications currently in use at SMUD. The resulting contract will be for a one (1) year period, with options to renew for up to three (3) additional years. The AMS Provider may also be asked to provide a fixed fee task proposal(s) for professional services for more sizable project work such as implementing an additional WFS Module or upgrading WFS to Suite.
Services 08/22/2024 09/20/2024
Doc4757755905
Distributed Antenna System Integrator
Show description Hide description
DAS Integrator Procurement
Const 08/27/2024 09/11/2024
Doc4759748609
RFP for Mechanical Projects Contract
Show description Hide description
<p style=" "><font face="courier new, courier, monospace"><strong><span style="font-size: 11pt;">RFP for Mechanical Projects Contract</span></strong><span style="font-size: 11pt;"> </span></font></p><p style=" "><span style="font-size: 11pt;"><font face="courier new, courier, monospace"> </font></span></p><p class="MsoBodyText" style=" tab-stops:1.0in"><font face="courier new, courier, monospace"><span style="font-size: 11pt;">SMUD is seeking qualified Contractors to provide MECHANICAL PROJECTS CONTRACTING SERVICES. </span><span style="font-size: 11pt;">This is a master task contract that will include a variety of project types. The work may include, but is not limited to mechanical design, hydronic system design, control systems programming and construction services, encompassing HVAC, plumbing, piping, construction, and design support, along with miscellaneous work in support of SMUD’s Facility Operations. </span></font></p><p class="MsoBodyText" style=" tab-stops:1.0in"><span style="font-size: 11pt;"><font face="courier new, courier, monospace"> </font></span></p><span style="font-size: 11pt;"><font face="courier new, courier, monospace">Services are needed by approximately January 1, 2025, and the resulting contract(s) will run for five (5) years. </font></span> <span style="font-size: 11pt;"><font face="courier new, courier, monospace"> </font></span> <span style="font-size: 11pt;"><font face="courier new, courier, monospace">SMUD intends to award one or more contract(s) to the highest rated Proposer as a result of this solicitation. The work to be performed under the resulting contract(s) shall be in the form of individual Purchase Orders. The aggregate amount of all tasks shall not exceed $11,000,000. </font></span> <font face="courier new, courier, monospace"><strong><span style="font-size: 11pt;"> </span></strong><span style="font-size: 11pt;"> </span></font> <font face="courier new, courier, monospace"><strong><span style="font-size: 11pt;">*DOCUMENTS WILL BE AVAILABLE FOR DOWNLOAD ON SEPTEMBER 5, 2024*</span></strong><span style="font-size: 11pt;"> </span></font> <font face="courier new, courier, monospace"> <strong><span style="font-size: 11pt;">PLEASE CLICK 'RESPOND TO POSTING' AND FOLLOW INSTRUCTIONS TO LOGIN AND REGISTER. THIS WILL PROVIDE ACCESS TO THE DOCUMENTS.</span></strong><span style="font-size: 11pt;"> </span></font>
Other 08/28/2024 10/10/2024
Doc4760204186
APPLICATION MANAGED SERVICES for SAP SUCCESSFACTORS ECP PCC
Show description Hide description
PLEASE READ: YOU WILL GET AN ERROR IF YOU CLICK "RESPOND TO POSTING PRIOR TO THE SOLICITATION EVENT GOING LIVE. THE EVENT WILL BE LIVE BY 5PM ON AUGUST 29, 2024. ONCE THE EVENT IS LIVE, you can select "Respond to Posting" and follow instructions to login and register. The purpose of this RFP is to seek a single SAP certified/authorized Application Managed Service Provider (“AMS Provider” or “Contractor”) to provide support to enhance and sustain SMUD’s SuccessFactors modules, ECP/PCC business applications currently in use at SMUD for one year with the option to renew for up to three (3) years.The AMS Provider may also be asked to provide a fixed fee task proposal(s) for professional services for more sizable project work such as implementing an additional module, etc.
Services 08/28/2024 09/23/2024
Doc4770618633
RFP Templates
Show description Hide description
<div>The work generally consists of various fencing construction &amp; maintenance work at SMUD’s various facilities during normal business hours.</div>
Const 09/04/2024 09/26/2024
Doc4770643673
GARLAND PACKET CAPTURE HARDWARE AND SUPPORT SERVICES
Show description Hide description
PLEASE NOTE: The Bid Request and all supporting documents will be made available by Monday, September 9, 2024. The Sacramento Municipal Utility District (SMUD) is soliciting bids for Garland Packet Capture Hardware and Support for a 5-year term with the option to extend for two (2) additional one-year terms thereafter. Maintenance and support will be renewed and paid for on an annual basis, with the exception of Year 1.
Services 09/04/2024 09/23/2024
Doc4772149925
RANCHO SECO UPS REPLACEMENT PROJECT
Show description Hide description
THIS SOLICITATION WILL BE AVAILABLE WHEN IT IS LIVE ON SEPTEMBER 6, 2024. RESPONSES WILL NOT BE ACCEPTED THROUGH EVENT MESSAGES OR EMAIL. RANCHO SECO UPS-A/1 &amp; UPS-B/2 REPLACEMENT PROJECT
Materials 09/05/2024 09/20/2024
Doc4772662617
Kestrel Pocket Wind Meter Anemometer
Show description Hide description
<span class="TextRun SCXW20429130 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-size: 11pt; white-space-collapse: preserve; line-height: 27px; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-variant-ligatures: none !important;"><span class="NormalTextRun SCXW20429130 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;">‘</span><span class="NormalTextRun SCXW20429130 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;">DOCUMENTS FOR THIS RF</span><span class="NormalTextRun SCXW20429130 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;">x</span><span class="NormalTextRun SCXW20429130 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;"> WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON September 6th, 2024.</span></span> <span class="TextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-size: 11pt; white-space-collapse: preserve; line-height: 27px; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-variant-ligatures: none !important;"><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;">‘</span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;">Please</span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;"> click </span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;">‘</span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;">Respond to Posting</span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;">’</span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;"> </span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;">and</span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;"> </span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;">follow instructions to login and register. This will provide </span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;">access </span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;">to </span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;">the documents.</span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;"> </span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;">If you click respond to posting </span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;">be fore</span><span class="NormalTextRun SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent;"> the Live on Date you will receive an error.’ </span></span><span class="EOP SCXW2823147 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-size: 11pt; white-space-collapse: preserve; line-height: 27px; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif;"> </span>
Materials 09/05/2024 09/13/2024
Doc4773741474
DAM SAFETY PROFESSIONAL ENGINEERING SERVICES
Show description Hide description
SMUD owns and operates 13 dams. They were designed starting in the late 1950s and constructed 1961 through 1970. Elevations of these dams range from 200 ft in the Central Valley to 6,500 ft in the Sierra Nevada; they are of earthen and concrete construction; and they range in height from 20 ft to 450 ft. Several dams include appurtenant structures such as spillway gates and saddle dikes. In descending order of elevation these dams are: • Rubicon Dam • Buck Island Dam • Loon Lake Dam • Gerle Dam • Robbs Peak Dam • Ice House Dam • Union Valley Dam • Junction Dam • Camino Dam • Brush Creek Dam • Slab Creek Dam • Chili Bar Dam • Rancho Seco Dam Based on past efforts, some of the types of detailed engineering and design could include the following examples. Consultation for related items not listed here may also be requested.· Spillway chute expertise; design evaluation, potential failure modes, risk assessment/mitigation, stability analyses, erodibility assessment· Hillslope erosion potential· Embankment dam stability· Concrete gravity and arch dam stabilityExpertise in new FERC Part 12D regulations to support follow-up risk reductions measures in response to recently completed Part 12D Reports. · Radial gate condition assessment and structural analysis· Seismic loading criteria and structure response studies· Geological assessment, geotechnical analysis, drilling program plans· Steel gate corrosion arrest and protectionConcrete maintenance and rehabilitation · Concrete dam foundation anchoring· Hydraulic (fluid dynamics) analysis· Dam failure modeling and inundation mapping· Concrete arch dam movement monitoring system· Owner’s Dam Safety Program (ODSP) review/auditIt is expected that the Contractor will provide good value to SMUD by assigning persons with expertise at a level appropriate to the task at hand, assigning highly qualified personnel only where warranted, and otherwise taking cost-controlling measures. Contractors shall invoice SMUD for engineering work and engineering geology work only when done or overseen by licensed engineers or geologists, and if so, work products shall be signed and stamped as required by California Department of Consumer Affairs regulations. If the work done does not qualify under those regulations, Contractor shall invoice SMUD at a non-professional engineering or geology rate.Communication is of the essence and SMUD’s assets have a long-term life. Drawings and reports will not only be critically reviewed by SMUD but also by federal and state regulators, often several staff members at each. Reports will be added to SMUD’s Digital Project Archive and critically reviewed by engineers every 10 years for the life of the dam.
Services 09/06/2024 09/27/2024