Doc3333746121
QTY 36 EA SPLICE KIT 12KV
Show description Hide description
RFQ WS3333335772 - QTY 36 EA SPLICE KIT 12KV
Materials Open 01/20/2022 01/25/2022
Doc3289341563
CHARGING AS A SERVICE - CONSTRUCTION
Show description Hide description
<font face="arial, helvetica, sans-serif" size="2"> CHARGING AS A SERVICE - CONSTRUCTION</font> <font face="arial, helvetica, sans-serif" size="2"> </font> <p class="Sub-bulletCxSpFirst"> <font face="arial, helvetica, sans-serif" size="2">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span> DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON APPROXIMATELY 12/20/2021.</font></p><font face="arial, helvetica, sans-serif" size="2"> </font> <p class="Sub-bulletCxSpMiddle"><font face="arial, helvetica, sans-serif" size="2">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting be fore the Live on Date you will receive an error.</font></p><font face="arial, helvetica, sans-serif" size="2"> </font> <font face="arial, helvetica, sans-serif" size="2">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; line-height: normal;"> SCOPE:</span></font> <p class="MsoBodyText"><font face="arial, helvetica, sans-serif" size="2">The Contractor shall furnish all supervision, labor, materials, equipment and incidentals necessary to accomplish the work in accordance with the Contract. The work generally consists of the following: constructing cast in place reinforced concrete structures including drilled piers, cast in place concrete foundations, constructing cast in place concrete retaining walls and cable trenches; setting reinforced precast concrete structures and service boxes, installing conduit duct banks, installing or modify electrical grounding systems, fencing, furnishing and placing aggregate base and crushed rock, grading and paving, providing as-built drawings, or any other construction related needs per the Contract drawings and Specifications.</font></p> <p class="MsoBodyText"><font face="arial, helvetica, sans-serif" size="2">The Electric Vehicle Supply Equipment will be furnished by others and installed by Contractor.</font> </p>
Services Open 12/15/2021 01/27/2022
Doc3279500879
Dense Wavelength Division Multiplexing (DWDM) System Deployment
Show description Hide description
Dense Wavelength Division Multiplexing (DWDM) System Deployment Contractor shall provide SMUD an operational Dense Wave Division Multiplex (DWDM) System. This system shall be established as the high-speed transport system for voice, data and video transport services for SMUD substations, power plants, hydro power plants and the Energy Management Center (EMC). The DWDM System shall span across Sacramento County. This will be a “hybrid turn-key” project where the Contractor shall design, engineer, furnish, test, document, and commission a fully operational DWDM System
Other Open 12/09/2021 01/28/2022
Doc3268220057
3 Year Strategic Alliance for AutoDesk Purchases and Renewals
Show description Hide description
This solicitation and the associated documents will be available for viewing and response after it is released. The release date for this solicitation was January 13th, 2022. Term: 4/1/2022-3/31/2025 Value: $350,000 Contract Manager: Germain Braaten Contract Admin: Austin Svien
Other Open 12/01/2021 02/03/2022
Doc3313637388
Line Assets Helicopters Services
Show description Hide description
The Proposer shall provide all transportation, labor, material, equipment, supervision, and incidentals required by SMUD to provide helicopter service for transporting SMUD and other authorized personnel and/or equipment for SMUD’s aerial transmission line surveying/patrols, pole setting, or wire stringing when required. When requested, SMUD would need helicopter services on an hourly and/or daily basis. The type of helicopter used in the performance of the work will vary on the requirements of the services requested.
Services Open 01/05/2022 02/04/2022
Doc3284816325
MARKETING, RESEARCH, AND DATA ANALYTICS
Show description Hide description
<strong>*DOCUMENTS SCHEDULED TO BE RELEASED 12/20/21*</strong> <p style="text-align:justify">As a leading energy provider, SMUD and the team you will be working with are responsible for three areas: Marketing, Research, and Data Analytics. </p> <p style="text-align:justify">SMUD intends to award multiple contracts for a three-year period, with the possibility of extension for another two years. In the past SMUD has awarded the contract to more than three vendors, but each solicitation is unique based on needs and proposals. Selected firms will be utilized on an “on-call or task authorization” basis. Through this procurement, SMUD will pre-select qualified consultants so we can use their assistance on short notice as a need arises. </p> <p class="MsoBodyText">Successful firms must be able to provide a holistic bid that works with the three areas identified above. The firms will be held responsible for all the subcontractors’ work and all final deliverables. </p>
Services Open 12/13/2021 02/11/2022
Doc3299113968
One (1) VC8 Water Truck 4000G 6X6D
Show description Hide description
<font size="3" face="times new roman, times, serif">BR WS3299113911 - One (1) VC8 Water Truck 4000G 6X6D </font> <font face="times new roman, times, serif"> </font> <font face="times new roman, times, serif" size="3">Please register to participate</font> <font face="times new roman, times, serif" size="3"> </font> <span style="font-size: 12pt; text-align: center;"><font face="times new roman, times, serif">SPECIFICATION FOR 6X6 TANDEM AXLE CAB AND CHASSIS 3500 GALLON WATER TRUCK AND EQUIPMENT</font></span> <p align="center" style="text-align:center"><span style="font-size:12.0pt"><font face="times new roman, times, serif"> </font></span></p><font face="times new roman, times, serif"><span style="font-size: 12pt;">It is the intent of this specification to describe the minimum acceptable requirements for a 3,500 gallon water truck with a 3-axle, 6x6 drivetrain, conventional type cab and chassis, with various accessories described herein. The Water Truck shall be hydraulically powered. The water tank shall be mounted on a cab chassis. Complete units shall be manufactured and tested in accordance with CAL/OSHA and ANSI standards. The unit must be delivered to the District complete and ready for operation.</span> </font><span style="font-family: &quot;times new roman&quot;, times, serif; font-size: 12pt;">Cummins X15</span><span style="font-family: &quot;times new roman&quot;, times, serif;"> </span>
Materials Open 12/22/2021 02/18/2022
Doc3299316133
FIVE (5) 4483P VC3 SERVICE TRUCK 4X2G
Show description Hide description
<font size="3" face="times new roman, times, serif"> BR WS3299316076 - FIVE (5) 4483P VC3 SERVICE TRUCK 4X2G</font> <font size="3" face="times new roman, times, serif"> </font> <font size="3" face="times new roman, times, serif"><span style="letter-spacing: -0.15pt;">It is the intent of this specification to describe the minimum acceptable requirements for a two wheel drive dual rear wheel, crew cab service truck with service body. The vehicle will be used throughout Sacramento County and SMUD Upper American River Project in elevations exceeding 6,000 feet. Vehicle will be delivered to the District complete and ready for service.</span> </font>
Services Open 12/22/2021 03/04/2022
Doc3322351293
2022 General Building Construction and Support Services
Show description Hide description
<p style="text-align:justify">This is a master task contract that will include a variety of project types. The work may include, but is not limited to tenant improvements projects, asphalt. and concrete parking repairs, installation of underground utilities and site work, electrical work, demolition, soil remediation, abatement of hazardous materials, structure repair and construction, HVAC work, replacement of end-of-life equipment and systems, fencing, roofing, landscaping, and miscellaneous work in support of ongoing Facility operations. </p>
Services Open 01/21/2022 03/11/2022
Doc3320756046
Contact Center Technology Replacement Project
Show description Hide description
<p>DOCUMENTS FOR THIS <span style="mso-bidi-font-size:12.0pt; line-height:107%">REQUEST FOR QUALIFICATIONS (RFQ) </span>WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON JANUARY 21, 2022. </p> <p class="Sub-bullet" style=" mso-add-space:auto;text-indent:0in; line-height:normal;mso-list:none">Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error message. <span style="background:yellow;mso-highlight:yellow"> </span></p> <p>The Sacramento Municipal Utility District (SMUD) is soliciting fixed price proposals to replace SMUD’s <span style="color:#222222">Avaya Aura Contact Center platform. This is intended to be for a five-year term with the option to extend for up to five additional one-year periods thereafter. </span></p><p style=" "><span style="color:#222222"> </span></p><p><span style="mso-bidi-font-size:12.0pt;line-height:107%">This RFQ is intended to provide a high-level overview of the project. This solicitation will be conducted in a two-step process: 1) Proposer must be qualified through this RFQ process, and 2) Follow-on Request For Proposal (RFP) documents will be provided thereafter and will contain further detailed information. </span></p><p style=" "><span style="mso-bidi-font-size: 12.0pt;line-height:107%"> </span></p><p>In order to qualify to receive the RFP documents, the Mandatory Requirements and Confidentiality and Non-Disclosure Agreement (“CNDA”) must be met, signed, and submitted via email to <a target="_blank" href="mailto:Dejona.Lopez@smud.org"><span style="mso-ansi-font-size:11.0pt; line-height:107%">Dejona.Lopez@smud.org</span></a>. No exceptions to the terms of the CNDA will be allowed. </p>
Other Open 01/20/2022 03/31/2022
Doc3137107346
Resource Planning and IRP Consulting Support Services
Show description Hide description
9/24/21: THE SOLICITATION IS NOW LIVE AND THE SOLICITATION DOCUMENTS ARE AVAILABLE FOR DOWNLOAD. 9/7/21: THE SOLICITATION DOCUMENTS ARE STILL NOT AVAILABLE, AS THE SOLICITATION IS NOT LIVE. I WILL PROVIDE AN UPDATE ONCE THE SOLICITATION HAS BEEN RELEASED. SOLICITATION DOCUMENTS WILL BECOME AVAILABLE ONCE SOLICITATION IS LIVE. SMUD is seeking one or more qualified firms to support resource planning, economic modeling, electric grid and market modeling and analysis to support its resource planning efforts to implement SMUD’s 2030 Zero Carbon Plan and other related planning activities. The services agreement will be task-based over the three (3) year contract term that may be renewed if needed. Individual task orders will be issued with a specific scope of work and budget authorization.
Services Closed 08/30/2021 10/28/2021
Doc3165101068
UARP - CAMINO UNIT 1 STATOR REPAIRS PROJECT
Show description Hide description
<p class="MsoBodyText">The Contractor shall provide all labor, material, and equipment and technical expertise required to perform generator stator cleaning and repairs on Camino unit #1. </p>
Materials Closed 09/20/2021 10/29/2021
Doc3140739506
UARP Switchgear Replacements
Show description Hide description
** Documents will be available to download on Monday, 9/20 ** <p style="text-align:justify">SMUD is requesting bids to establish a contract with a single switchgear supplier to support SMUD personnel in the design, manufacturing, testing, and delivery of replacement switchgear assemblies at Robbs Peak, Union Valley and Loon Lake powerhouses. Design of the switchgears is anticipated to begin in quarter 4 2021 and delivery will take place at mid-year 2022 for all facilities. SMUD will install the replacement switchgears at these facilities in Fall 2022 and Fall 2023. </p><p style="text-align:justify"><span style="color:fuchsia"> </span></p><p style="text-align:justify">The principal objective of this procurement is the vendor’s ability to deliver quality switchgear assemblies to SMUD in an expeditious and efficient manner at the most economical overall cost to SMUD.<span style="mso-spacerun:yes"> </span> </p>
Materials Closed 09/15/2021 11/03/2021
Doc3210389605
Substation Bushings 69kV
Show description Hide description
*** Documents will be available to download on 10/25. *** SMUD is requesting bids to issue a onetime purchase order with a 69kV substation bushing supplier to support SMUD’s inventory requirements. The principle objective of this procurement is the vendor’s ability to deliver quality bushings to SMUD in an expeditious and efficient manner at the most economical overall cost to SMUD.
Materials Closed 10/21/2021 11/04/2021
Doc3127414493
Substation Capacitor Banks
Show description Hide description
*** Documents should be available on Thursday, September 16, 2021 *** <p style="text-align:justify">SMUD is requesting bids to establish a three-year (with a possibility of an additional two-year extension) agreement with a substation capacitor bank supplier to support SMUD personnel with a reliable and continuous supply of capacitor banks. </p> <p style="text-align:justify">The principal objective of this procurement is the vendor’s ability to deliver quality substation capacitor banks to SMUD in an expeditious and efficient manner at the most economical overall cost to SMUD. </p> <p style="text-align:justify">SMUD’s estimate for this work is $3,500,000 </p> <p style="text-align:justify"><u>Quarterly Business Reviews (QBRs): </u></p><p style="text-align:justify">SMUD may request to hold quarterly business reviews during the contract term to monitor and review key performance indicators (KPIs), plan for joint process improvement efforts, and discuss industry trends. </p> <p style="text-align:justify">SMUD expects the Proposer to meet or exceed key performance metrics and to attend these QBRs either virtually or in person, prepare relevant reports and other presentation materials, and present this information to SMUD. </p> <p style="text-align:justify"><u>Performance Metrics: </u></p><p class="MsoListParagraphCxSpFirst" style="text-align:justify;text-indent:-.25in; mso-list:l0 level1 lfo1"> <span style="font-family:Symbol; mso-fareast-font-family:Symbol;mso-bidi-font-family:Symbol">·<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> Maintaining Delivery Schedule </p><p class="MsoListParagraphCxSpMiddle" style="text-align:justify;text-indent:-.25in; mso-list:l0 level1 lfo1"> <span style="font-family:Symbol; mso-fareast-font-family:Symbol;mso-bidi-font-family:Symbol">·<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> Communication with SMUD on fabrication, shipment, and delivery </p><p class="MsoListParagraphCxSpMiddle" style="text-align:justify;text-indent:-.25in; mso-list:l0 level1 lfo1"> <span style="font-family:Symbol; mso-fareast-font-family:Symbol;mso-bidi-font-family:Symbol">·<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> ASBUILTS and manuals provided to SMUD and in a timely manner </p><p class="MsoListParagraphCxSpMiddle" style="text-align:justify;text-indent:-.25in; mso-list:l0 level1 lfo1"> <span style="font-family:Symbol; mso-fareast-font-family:Symbol;mso-bidi-font-family:Symbol">·<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> Quality of product/frequency of the following: </p><p class="MsoListParagraphCxSpMiddle" style=" mso-add-space: auto;text-align:justify;text-indent:-.25in;mso-list:l0 level2 lfo1"> <span style="font-family:&quot;Courier New&quot;;mso-fareast-font-family:&quot;Courier New&quot;">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> Repairs/tech services </p><p class="MsoListParagraphCxSpMiddle" style=" mso-add-space: auto;text-align:justify;text-indent:-.25in;mso-list:l0 level2 lfo1"> <span style="font-family:&quot;Courier New&quot;;mso-fareast-font-family:&quot;Courier New&quot;">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> Replacement parts </p><p class="MsoListParagraphCxSpMiddle" style=" mso-add-space: auto;text-align:justify;text-indent:-.25in;mso-list:l0 level2 lfo1"> <span style="font-family:&quot;Courier New&quot;;mso-fareast-font-family:&quot;Courier New&quot;">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> Sending back to factory </p><p class="MsoListParagraphCxSpMiddle" style=" mso-add-space: auto;text-align:justify;text-indent:-.25in;mso-list:l0 level2 lfo1"> <span style="font-family:&quot;Courier New&quot;;mso-fareast-font-family:&quot;Courier New&quot;">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> Damage to equipment </p><p class="MsoListParagraphCxSpLast" style=" mso-add-space:auto; text-align:justify;text-indent:-.25in;mso-list:l0 level2 lfo1"> <span style="font-family:&quot;Courier New&quot;;mso-fareast-font-family:&quot;Courier New&quot;">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> Failures after energization </p> <p style="text-align:justify"><a target="_blank" target="_blank">Failure on the part of the successful Bidder to meet these key performance metrics may have a serious impact on any consideration for future business with SMUD. </a></p> <p style="text-align:justify"><u>Customer Service: </u></p><p style="text-align:justify">SMUD expects any shortage in material supply or plant outage would be communicated to SMUD within 24 hours of the issue being identified. </p> <p style="text-align:justify">Bidder shall identify SMUD-approved support personnel who shall be available during normal business hours for customer service support. Bidder’s support personnel shall be available during normal operating hours to provide onsite support for SMUD, including troubleshooting and training. In some cases, Bidder may be asked to visit SMUD facilities in person to review any issues. </p> <p style="text-align:justify">During emergency crisis, the Bidder will provide support personnel who shall be available during non-business hours to assist in the coordination and delivery of Substation Switchgear to SMUD locations as requested. </p> <p style="text-align:justify">Bidder shall provide such names and contact numbers at the beginning of this contract term and shall be responsible for any updates to these personnel. </p> <p style="text-align:justify">Bidder shall notify SMUD of any changes to the manufacturing locations and shall not proceed with manufacturing until SMUD has approved the new manufacturing location. </p> <p style="text-align:justify"><u>Reporting: </u></p><p style="text-align:justify">SMUD expects the Bidder to provide regular reports during the contract term to identify and provide updates for any outstanding orders. </p><p style="text-align:justify"><span style="color:red"> </span></p><p style="text-align:justify"><u>Drawings: </u></p> <p style="text-align:justify">Bidder shall provide SMUD with engineering submittals within 30 days from the time of award and provide drawing submittals within 60 days from the time of award. </p>
Materials Closed 09/14/2021 11/04/2021
Doc3176053345
THERMAL POWER PLANT ENGINEERING SERVICES
Show description Hide description
The Contractor(s) shall provide all labor, material, and equipment required to perform the Service described as: THERMAL POWER PLANT ENGINEERING SERVICES. SMUD will award one or more contracts for a ten-year period for a total aggregate not to exceed amount of $10,000,000. The first three years of the contract will have fixed labor rates. Subsequent years will be subject to CPI matched increases.SMUD’s Balancing Authority includes power supply from three (3) combined cycle co-generation, one (1) simple cycle and one (1) combined cycle thermal power plants. Ownership of all of these plants is through Joint Powers Authority (JPA). Late in 2021 all JPAs will be consolidated into a single JPA entity. SMUD manages these JPAs and has set up a single operations contractor, Ethos Energy Group, for all of the thermal power plants. The operations contractor coordinates operations and maintenance activities but includes SMUD in design change review and approval.SMUD has enacted a 2030 Zero Carbon Plan, which aims to reduce SMUD’s carbon footprint to zero, rather than net-zero by 2030. Significant changes for the current thermal fleet are therefore expected to occur over the next decade. At this point in time, at least two plants, McClellan Peaker and Campbell’s Soup Cogeneration plant are projected to cease operations in 2024 and 2025, respectively, subject to confirmation of ongoing reliability studies to confirm alternate capabilities in SMUD’s overall energy portfolio. However, as SMUD actively pursues new technologies, and as opportunities present themselves, there will be transitions to the thermal fleet that are currently unknown, and that will be dependent upon significant market drivers. SMUD is looking to contract with firm(s) that have thermal plant industry expertise and proven capabilities to maneuver in new and innovative territories focused on zero carbon solutions.
Services Closed 09/27/2021 11/05/2021
Doc3201961691
NERC AND WECC TESTING, VALIDATION, AND REPORTS
Show description Hide description
Contractor shall provide the following NERC/WECC tasks. Identify and request from SMUD any additional data required for properly testing and validating models. All the generation facilities below are within 70 miles from Sacramento County. Provide reports to the Project Manager on all the units specified below for submission to the transmission operator or WECC. 1) Provide services and equipment necessary for field testing, developing generator control models and validating NERC/WECC model parameters for the following SMUD hydro generators, to comply with NERC/WECC MOD-025-2, MOD-026-1, and MOD-027-1. Review data and provide simulation models in GE PSLF format. The dates below are estimated schedule and are subject to change. a. White Rock Powerhouse Units 1 &amp; 2, Date: June 2022, MOD-025 b. Camino Powerhouse Units 1&amp; 2, Date: June 2023, MOD-025 c. Jaybird Powerhouse Units 1 &amp; 2 and Union Valley Powerhouse Unit 1, Date: June 2024, MOD-025 d. White Rock Powerhouse Units 1 &amp; 2, Date: June 2027, MOD-026, MOD-027 2) Provide services to verify and validate NERC/WECC PRC-024-3 for Solano Wind Generation, Phase 1&amp;2 and 3. Date: February 2022. 3) Provide additional service tasks as needed similar to the NERC MODs and PRCs above, with funding of $50,000.
Services Closed 10/15/2021 11/10/2021
Doc3187437325
IFB for FENCE CONSTRUCTION AND REPAIR SERVICES
Show description Hide description
<strong>*DOCUMENTS WILL BE AVAILABLE FOR DOWNLOAD ON OCTOBER 13, 2021*</strong> IFB for FENCE CONSTRUCTION AND REPAIR SERVICES <span style="font-size:11.5pt;mso-bidi-font-size:11.0pt; font-family:&quot;Times New Roman&quot;,serif;mso-fareast-font-family:Calibri;mso-fareast-theme-font: minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font:minor-latin; mso-bidi-theme-font:minor-bidi;letter-spacing:-.05pt;mso-ansi-language:EN-US; mso-fareast-language:EN-US;mso-bidi-language:AR-SA">The</span><span style="font-size:11.5pt;mso-bidi-font-size:11.0pt;font-family:&quot;Times New Roman&quot;,serif; mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-font-family: Calibri;mso-hansi-theme-font:minor-latin;mso-bidi-theme-font:minor-bidi; letter-spacing:.85pt;mso-ansi-language:EN-US;mso-fareast-language:EN-US; mso-bidi-language:AR-SA"> </span><span style="font-size:11.5pt;mso-bidi-font-size: 11.0pt;font-family:&quot;Times New Roman&quot;,serif;mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font: minor-latin;mso-bidi-theme-font:minor-bidi;letter-spacing:-.1pt;mso-ansi-language: EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">Contractor</span><span style="font-size:11.5pt;mso-bidi-font-size:11.0pt;font-family:&quot;Times New Roman&quot;,serif; mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-font-family: Calibri;mso-hansi-theme-font:minor-latin;mso-bidi-theme-font:minor-bidi; letter-spacing:.95pt;mso-ansi-language:EN-US;mso-fareast-language:EN-US; mso-bidi-language:AR-SA"> </span><span style="font-size:11.5pt;mso-bidi-font-size: 11.0pt;font-family:&quot;Times New Roman&quot;,serif;mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font: minor-latin;mso-bidi-theme-font:minor-bidi;letter-spacing:-.1pt;mso-ansi-language: EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">shall</span><span style="font-size:11.5pt;mso-bidi-font-size:11.0pt;font-family:&quot;Times New Roman&quot;,serif; mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-font-family: Calibri;mso-hansi-theme-font:minor-latin;mso-bidi-theme-font:minor-bidi; letter-spacing:1.0pt;mso-ansi-language:EN-US;mso-fareast-language:EN-US; mso-bidi-language:AR-SA"> </span><span style="font-size:11.5pt;mso-bidi-font-size: 11.0pt;font-family:&quot;Times New Roman&quot;,serif;mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font: minor-latin;mso-bidi-theme-font:minor-bidi;letter-spacing:-.1pt;mso-ansi-language: EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">furnish</span><span style="font-size:11.5pt;mso-bidi-font-size:11.0pt;font-family:&quot;Times New Roman&quot;,serif; mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-font-family: Calibri;mso-hansi-theme-font:minor-latin;mso-bidi-theme-font:minor-bidi; letter-spacing:.8pt;mso-ansi-language:EN-US;mso-fareast-language:EN-US; mso-bidi-language:AR-SA"> </span><span style="font-size:11.5pt;mso-bidi-font-size: 11.0pt;font-family:&quot;Times New Roman&quot;,serif;mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font: minor-latin;mso-bidi-theme-font:minor-bidi;letter-spacing:-.05pt;mso-ansi-language: EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">all</span><span style="font-size:11.5pt;mso-bidi-font-size:11.0pt;font-family:&quot;Times New Roman&quot;,serif; mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-font-family: Calibri;mso-hansi-theme-font:minor-latin;mso-bidi-theme-font:minor-bidi; letter-spacing:.85pt;mso-ansi-language:EN-US;mso-fareast-language:EN-US; mso-bidi-language:AR-SA"> </span><span style="font-size:11.5pt;mso-bidi-font-size: 11.0pt;font-family:&quot;Times New Roman&quot;,serif;mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font: minor-latin;mso-bidi-theme-font:minor-bidi;letter-spacing:-.1pt;mso-ansi-language: EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">supervision,</span><span style="font-size:11.5pt;mso-bidi-font-size:11.0pt;font-family:&quot;Times New Roman&quot;,serif; mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-font-family: Calibri;mso-hansi-theme-font:minor-latin;mso-bidi-theme-font:minor-bidi; letter-spacing:.8pt;mso-ansi-language:EN-US;mso-fareast-language:EN-US; mso-bidi-language:AR-SA"> </span><span style="font-size:11.5pt;mso-bidi-font-size: 11.0pt;font-family:&quot;Times New Roman&quot;,serif;mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font: minor-latin;mso-bidi-theme-font:minor-bidi;letter-spacing:-.1pt;mso-ansi-language: EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">labor,</span><span style="font-size:11.5pt;mso-bidi-font-size:11.0pt;font-family:&quot;Times New Roman&quot;,serif; mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-font-family: Calibri;mso-hansi-theme-font:minor-latin;mso-bidi-theme-font:minor-bidi; letter-spacing:.8pt;mso-ansi-language:EN-US;mso-fareast-language:EN-US; mso-bidi-language:AR-SA"> </span><span style="font-size:11.5pt;mso-bidi-font-size: 11.0pt;font-family:&quot;Times New Roman&quot;,serif;mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font: minor-latin;mso-bidi-theme-font:minor-bidi;letter-spacing:-.1pt;mso-ansi-language: EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">materials,</span><span style="font-size:11.5pt;mso-bidi-font-size:11.0pt;font-family:&quot;Times New Roman&quot;,serif; mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-font-family: Calibri;mso-hansi-theme-font:minor-latin;mso-bidi-theme-font:minor-bidi; letter-spacing:.8pt;mso-ansi-language:EN-US;mso-fareast-language:EN-US; mso-bidi-language:AR-SA"> </span><span style="font-size:11.5pt;mso-bidi-font-size: 11.0pt;font-family:&quot;Times New Roman&quot;,serif;mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font: minor-latin;mso-bidi-theme-font:minor-bidi;letter-spacing:-.1pt;mso-ansi-language: EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">equipment</span><span style="font-size:11.5pt;mso-bidi-font-size:11.0pt;font-family:&quot;Times New Roman&quot;,serif; mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-font-family: Calibri;mso-hansi-theme-font:minor-latin;mso-bidi-theme-font:minor-bidi; letter-spacing:.75pt;mso-ansi-language:EN-US;mso-fareast-language:EN-US; mso-bidi-language:AR-SA"> </span><span style="font-size:11.5pt;mso-bidi-font-size: 11.0pt;font-family:&quot;Times New Roman&quot;,serif;mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font: minor-latin;mso-bidi-theme-font:minor-bidi;letter-spacing:-.05pt;mso-ansi-language: EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">and</span><span style="font-size:11.5pt;mso-bidi-font-size:11.0pt;font-family:&quot;Times New Roman&quot;,serif; mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-font-family: Calibri;mso-hansi-theme-font:minor-latin;mso-bidi-theme-font:minor-bidi; letter-spacing:.9pt;mso-ansi-language:EN-US;mso-fareast-language:EN-US; mso-bidi-language:AR-SA"> </span><span style="font-size:11.5pt;mso-bidi-font-size: 11.0pt;font-family:&quot;Times New Roman&quot;,serif;mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font: minor-latin;mso-bidi-theme-font:minor-bidi;letter-spacing:-.1pt;mso-ansi-language: EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">incidentals</span><span style="font-size:11.5pt;mso-bidi-font-size:11.0pt;font-family:&quot;Times New Roman&quot;,serif; mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-font-family: Calibri;mso-hansi-theme-font:minor-latin;mso-bidi-theme-font:minor-bidi; letter-spacing:.8pt;mso-ansi-language:EN-US;mso-fareast-language:EN-US; mso-bidi-language:AR-SA"> </span><span style="font-size:11.5pt;mso-bidi-font-size: 11.0pt;font-family:&quot;Times New Roman&quot;,serif;mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font: minor-latin;mso-bidi-theme-font:minor-bidi;letter-spacing:-.1pt;mso-ansi-language: EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">necessary</span><span style="font-size:11.5pt;mso-bidi-font-size:11.0pt;font-family:&quot;Times New Roman&quot;,serif; mso-fareast-font-family:Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-font-family: Calibri;mso-hansi-theme-font:minor-latin;mso-bidi-theme-font:minor-bidi; letter-spacing:4.05pt;mso-ansi-language:EN-US;mso-fareast-language:EN-US; mso-bidi-language:AR-SA"> </span><span style="font-size:11.5pt;mso-bidi-font-size: 11.0pt;font-family:&quot;Times New Roman&quot;,serif;mso-fareast-font-family:Calibri; mso-fareast-theme-font:minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font: minor-latin;mso-bidi-theme-font:minor-bidi;mso-ansi-language:EN-US;mso-fareast-language: EN-US;mso-bidi-language:AR-SA">to<span style="letter-spacing:2.25pt"> </span><span style="letter-spacing:-.1pt">install</span><span style="letter-spacing:1.1pt"> </span><span style="letter-spacing:-.05pt">new</span><span style="letter-spacing:1.15pt"> </span><span style="letter-spacing:-.1pt">fencing,</span><span style="letter-spacing:1.05pt"> </span><span style="letter-spacing:-.1pt">install</span><span style="letter-spacing: 1.1pt"> </span><span style="letter-spacing:-.05pt">new</span><span style="letter-spacing:1.15pt"> </span><span style="letter-spacing:-.1pt">gates,</span><span style="letter-spacing:1.05pt"> </span><span style="letter-spacing:-.05pt">and</span><span style="letter-spacing:1.05pt"> </span><span style="letter-spacing:-.1pt">make</span><span style="letter-spacing:1.1pt"> </span><span style="letter-spacing:-.1pt">fence</span><span style="letter-spacing:1.1pt"> </span><span style="letter-spacing:-.1pt">additions,</span><span style="letter-spacing:1.15pt"> </span><span style="letter-spacing:-.1pt">repairs</span><span style="letter-spacing:1.15pt"> </span><span style="letter-spacing:-.1pt">or</span><span style="letter-spacing:1.2pt"> </span><span style="letter-spacing:-.1pt">changes</span><span style="letter-spacing:1.05pt"> </span>to<span style="letter-spacing:1.2pt"> </span><span style="letter-spacing:-.1pt">various</span><span style="letter-spacing:4.05pt"> </span><span style="letter-spacing:-.05pt">SMUD</span><span style="letter-spacing: 1.4pt"> </span><span style="letter-spacing:-.1pt">fences.</span></span> <span style="font-size: 11pt; background-color: rgb(41, 41, 41); color: rgb(255, 255, 255); font-family: &quot;Segoe UI&quot;, system-ui, &quot;Apple Color Emoji&quot;, &quot;Segoe UI Emoji&quot;, sans-serif;"><strong>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents.</strong></span>
Materials Closed 10/12/2021 11/10/2021
Doc3142825830
Substation Circuit Breakers SF6
Show description Hide description
*** Documents should be available to access / download on 10/6/2021 *** SMUD is requesting proposals to establish a five-year agreement with one or more Substation circuit breaker suppliers to support SMUD personnel with a reliable and continuous supply of 230kV, 115kV, and 69kV SF6 circuit breakers. The principal objective of this procurement is the vendor’s ability to deliver quality circuit breakers to SMUD in an expeditious and efficient manner at the most economical overall cost to SMUD. Only proposers meeting the following minimum qualification should submit proposals: • No minimum order quantities • A strong national presence easily recognized nationwide • International Standard Organization (ISO) Certification • A support system to provide assistance Proposer to list five (5) customer references. The references must include government or private industry accounts similar in scope to this bid request. These references may be surveyed as to service only, not pricing or costs. Survey questions would involve order processing, delivery, returns and credits. SMUD intends to award one or more contracts for a not-to-exceed aggregate amount of $4,000,000.
Materials Closed 10/04/2021 11/11/2021
Doc3179852424
GENERAL ENGINEERING SERVICE FOR SUBSTATION DESIGN
Show description Hide description
This Request for Proposal solicits proposals from qualified engineering firms to provide engineering services for substation projects. SMUD anticipates awarding one or more contracts as a result of this solicitation for a combined total not-to-exceed amount. SMUD anticipates the contract(s) to be in effect from date of award to September 2024.
Services Closed 09/29/2021 11/12/2021
Doc3216732518
OFFSITE STORAGE OF HARDCOPY RECORDS AND MEDIA
Show description Hide description
The Sacramento Municipal Utility District is soliciting proposals from qualified Information Storage Service Providers to furnish off-site physical information storage and related services for boxed physical information, X-Ray film, electronic data processing media and microfilm media. Services are needed from approximately January 1, 2022, through September 30, 2027 (five years), with the option to extend the contract each year after the initial term for a maximum of three additional years (through approximately September 30, 2030).
Services Closed 10/26/2021 11/19/2021
Doc3246283033
OMICRON CPC100 MULTIFUNCTION TEST SET VE000621
Show description Hide description
OMICRON CPC100 MULTIFUNCTION TEST SET VE000621 - RFQ WS3246216828
Materials Closed 11/16/2021 11/19/2021
Doc3140739557
Union Valley Transformer T2 Replacement
Show description Hide description
*** Documents will be available to download on 9/30 *** SMUD is requesting bids to establish a Contract with a single transformer supplier. SMUD is seeking design, manufacturing, storage, testing, and delivery of a replacement transformer at Union Valley Switchyard. Design of the transformer will begin in Q1 2022, the transformer will be built and stored by Q1 2023, and delivery will take place in or before Q3 2023. Installation will take place in Fall 2023.
Materials Closed 09/27/2021 11/24/2021
Doc3186272048
Power Transformers for Station B and Station H
Show description Hide description
** RFP Documents should be available to download on 10/12. Please use Google Chrome. *** SMUD is requesting proposals to establish a Contract with one or more power transformer suppliers. SMUD expects to order one power transformer that shall be delivered within one year from final Contract confirmation date, and two additional transformers that shall be delivered within two years from final Contract approval date. In additional to building and delivering power transformers according with SMUD’s engineering specifications and drawings, the Contractor shall be responsible for all shipping, drayage, and placing each transformer on SMUD’s designated foundation pad located in Sacramento County, California. The Contractor shall also be responsible for onsite assembly, oil processing &amp; filling, and testing the transformer after delivery. The principal objective of this procurement is the vendor’s ability to deliver high quality power transformers in an expeditious and efficient manner at the most economical overall cost to SMUD.
Materials Closed 10/06/2021 11/30/2021
Doc3211954998
IFB for UARP Vegetation Management Services
Show description Hide description
<p style=" "><strong><span style="font-size:10.0pt;font-family:&quot;Verdana&quot;,sans-serif; color:black"><span style="font-variant-ligatures: normal;font-variant-caps: normal; orphans: 2;text-align:start;widows: 2;-webkit-text-stroke-width: 0px; text-decoration-thickness: initial;text-decoration-style: initial;text-decoration-color: initial; float:none;word-spacing:0px">IFB for UARP Vegetation Management Services</span></span></strong><span style="font-size:8.5pt;font-family:&quot;Verdana&quot;,sans-serif;color:black"> </span></p><p style=" font-variant-ligatures: normal;font-variant-caps: normal; orphans: 2;text-align:start;widows: 2;-webkit-text-stroke-width: 0px; text-decoration-thickness: initial;text-decoration-style: initial;text-decoration-color: initial; word-spacing:0px"><span style="font-size:8.5pt;font-family:&quot;Verdana&quot;,sans-serif; color:black"> </span></p><p style="font-variant-ligatures: normal;font-variant-caps: normal; orphans: 2;text-align:start;widows: 2;-webkit-text-stroke-width: 0px; text-decoration-thickness: initial;text-decoration-style: initial;text-decoration-color: initial; word-spacing:0px"><span style="font-size:10.0pt;font-family:&quot;Verdana&quot;,sans-serif; color:black">SMUD is seeking qualified Contractors to provide Vegetation Management Services for Power Generation. SMUD intends to award one or more contracts to the lowest responsive bidder for a three (3) year period with an option for two (2) one-year extensions beginning approximately January 1, 2022.</span><span style="font-size:8.5pt;font-family:&quot;Verdana&quot;,sans-serif;color:black"> </span></p><p style="font-variant-ligatures: normal;font-variant-caps: normal; orphans: 2;text-align:start;widows: 2;-webkit-text-stroke-width: 0px; text-decoration-thickness: initial;text-decoration-style: initial;text-decoration-color: initial; word-spacing:0px"><strong><span style="background-image:initial;background-position: initial;background-size: initial;background-repeat:initial;background-attachment: initial;background-origin: initial;background-clip: initial"><span style="font-size:10.0pt;font-family:&quot;Arial&quot;,sans-serif;color:black"> </span></span></strong><span style="font-size:8.5pt;font-family:&quot;Verdana&quot;,sans-serif;color:black"> </span></p><p style="font-variant-ligatures: normal;font-variant-caps: normal; orphans: 2;text-align:start;widows: 2;-webkit-text-stroke-width: 0px; text-decoration-thickness: initial;text-decoration-style: initial;text-decoration-color: initial; word-spacing:0px"><strong><span style="background-image:initial;background-position: initial;background-size: initial;background-repeat:initial;background-attachment: initial;background-origin: initial;background-clip: initial"><span style="font-size:10.0pt;font-family:&quot;Arial&quot;,sans-serif;color:black">*DOCUMENTS WILL BE AVAILABLE FOR DOWNLOAD ON OCTOBER 27, 2021*</span></span></strong><span style="font-size:10.0pt;font-family:&quot;Arial&quot;,sans-serif;color:black"><span style="background-image:initial;background-position:initial;background-size: initial; background-repeat:initial;background-attachment:initial;background-origin: initial; background-clip: initial"> </span> <br style="mso-special-character:line-break" /> <br style="mso-special-character:line-break" /> </span><span style="font-size:8.5pt;font-family:&quot;Verdana&quot;,sans-serif; color:black"> </span></p><p style=" font-variant-ligatures: normal;font-variant-caps: normal; orphans: 2;text-align:start;widows: 2;-webkit-text-stroke-width: 0px; text-decoration-thickness: initial;text-decoration-style: initial;text-decoration-color: initial; word-spacing:0px"><strong><span style="background-image:initial;background-position: initial;background-size: initial;background-repeat:initial;background-attachment: initial;background-origin: initial;background-clip: initial"><span style="font-size:10.0pt;font-family:&quot;Arial&quot;,sans-serif;color:black">PLEASE CLICK 'RESPOND TO POSTING' AND FOLLOW INSTRUCTIONS TO LOGIN AND REGISTER. THIS WILL PROVIDE ACCESS TO THE DOCUMENTS.</span></span></strong><span style="font-size:10.0pt;font-family:&quot;Verdana&quot;,sans-serif;color:black"> </span><span style="font-size:8.5pt;font-family:&quot;Verdana&quot;,sans-serif;color:black"> </span></p>
Services Closed 10/25/2021 12/01/2021
Doc3195807553
RFP for METERING MAINTENANCE PROJECT
Show description Hide description
<strong style="font-family: &quot;72&quot;, Arial, Helvetica, sans-serif;">*DOCUMENTS WILL BE AVAILABLE FOR DOWNLOAD ON OCTOBER 14, 2021*</strong> <br style="font-family: &quot;72&quot;, Arial, Helvetica, sans-serif;" /><strong></strong> The Contractor shall provide SMUD with Advanced Metering Infrastructure (AMI) Meter Replacement Services. This project is a component of the SMUD’s Meter Maintenance Project. The Contractor will be responsible for all supervision, labor, tools, software, handhelds and equipment required – excluding meters, locking rings, meter locking ring keys, meter seals and “pie plates” - to perform the work described herein, including the removal of current targeted AMI meters and installation of new AMI meters <strong>PLEASE CLICK 'RESPOND TO POSTING' AND FOLLOW INSTRUCTIONS TO LOGIN AND REGISTER. THIS WILL PROVIDE ACCESS TO THE DOCUMENTS.</strong>
Services Closed 10/13/2021 12/02/2021
Doc3242172247
BR 4459A-VC8 Water Truck
Show description Hide description
4459A-VC8 Water Truck 3600G 6X4D <p class="Sub-bulletCxSpFirst">DOCUMENTS FOR THIS BID REQUEST WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 11/16/2021. </p> Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. <span style="background: yellow;">If you click respond to posting be fore the Live on Date you will receive an error.’</span>
Materials Closed 11/16/2021 12/07/2021
Doc3249616709
Smart Inverter Communications Information
Show description Hide description
**PLEASE NOTE: Actual due date is December 8, 2021 at 5:00pm PST Request for Information - Smart Inverter Communications Information
Materials Closed 11/18/2021 12/08/2021
Doc3247747770
BR 4452A Water Truck
Show description Hide description
Bid Request for a SMUD 4452A Water Truck 3500G 6X6D <p class="Sub-bulletCxSpFirst">DOCUMENTS FOR THIS BID REQUEST WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 11/17/2021. </p> Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. <span style="background: yellow;">If you click respond to posting be fore the Live on Date you will receive an error.’</span>
Materials Closed 11/17/2021 12/09/2021
Doc3277948998
GPO USM SERIES VI UPGRADE KIT
Show description Hide description
<font size="3" face="times new roman, times, serif"> GPO USM SERIES VI UPGRADE KIT - RFQ WS3277899753 </font>
Materials Closed 12/08/2021 12/10/2021
Doc3238541876
Roof Replacement & Repair Services
Show description Hide description
<p class="MsoBodyText" style=" ">The<span style="letter-spacing: 1.45pt"> </span><span style="letter-spacing:-.05pt">Contractor</span><span style="letter-spacing:1.5pt"> </span>shall<span style="letter-spacing:1.55pt"> </span><span style="letter-spacing:-.05pt">furnish</span><span style="letter-spacing:1.55pt"> </span><span style="letter-spacing:-.05pt">all</span><span style="letter-spacing: 1.65pt"> </span><span style="letter-spacing:-.05pt">project</span><span style="letter-spacing:1.55pt"> </span><span style="letter-spacing:-.05pt">management,</span><span style="letter-spacing:1.6pt"> </span><span style="letter-spacing:-.05pt">supervision,</span><span style="letter-spacing:1.5pt"> </span><span style="letter-spacing:-.05pt">labor,</span><span style="letter-spacing:1.5pt"> </span><span style="letter-spacing:-.05pt">materials,</span><span style="letter-spacing:1.55pt"> </span><span style="letter-spacing:-.05pt">equipment,</span><span style="letter-spacing:5.45pt"> </span><span style="letter-spacing:-.05pt">and</span><span style="letter-spacing:1.4pt"> </span><span style="letter-spacing:-.05pt">incidentals</span><span style="letter-spacing:1.4pt"> </span><span style="letter-spacing:-.05pt">necessary</span><span style="letter-spacing:1.3pt"> </span>to<span style="letter-spacing:1.45pt"> </span><span style="letter-spacing:-.05pt">accomplish</span><span style="letter-spacing: 1.45pt"> </span>the<span style="letter-spacing:1.4pt"> </span><span style="letter-spacing:-.05pt">work</span><span style="letter-spacing:1.4pt"> </span>in<span style="letter-spacing:1.45pt"> </span><span style="letter-spacing:-.05pt">accordance</span><span style="letter-spacing:1.35pt"> </span>with<span style="letter-spacing:1.45pt"> </span>the<span style="letter-spacing:1.4pt"> </span><span style="letter-spacing:-.05pt">Contract.</span><span style="letter-spacing:2.85pt"> </span>The<span style="letter-spacing:1.35pt"> </span><span style="letter-spacing:-.05pt">work</span><span style="letter-spacing:4.55pt"> </span>generally<span style="letter-spacing:.45pt"> </span><span style="letter-spacing:-.05pt">consists</span><span style="letter-spacing:.6pt"> </span>of<span style="letter-spacing:.55pt"> </span>various<span style="letter-spacing:.55pt"> </span>building<span style="letter-spacing:.65pt"> </span>or<span style="letter-spacing:.65pt"> </span>site<span style="letter-spacing: .7pt"> </span><span style="letter-spacing:-.05pt">renovation</span><span style="letter-spacing:.55pt"> </span>tasks<span style="letter-spacing:.55pt"> </span><span style="letter-spacing:-.05pt">and</span><span style="letter-spacing:.65pt"> </span><span style="letter-spacing:-.05pt">associated</span><span style="letter-spacing: .55pt"> </span><span style="letter-spacing:-.05pt">work</span><span style="letter-spacing:.65pt"> </span>to<span style="letter-spacing:.6pt"> </span>be<span style="letter-spacing:2.85pt"> </span><span style="letter-spacing:-.05pt">performed</span><span style="letter-spacing:.05pt"> </span><span style="letter-spacing:-.05pt">at</span> SMUD’s various <span style="letter-spacing:-.05pt">facilities</span> primarily<span style="letter-spacing:-.05pt"> </span>during<span style="letter-spacing:-.15pt"> </span>non-business hours. </p><p class="MsoBodyText" style=" ">This<span style="letter-spacing: .95pt"> </span>is<span style="letter-spacing:.95pt"> </span>a<span style="letter-spacing:.9pt"> </span>task<span style="letter-spacing:.95pt"> </span><span style="letter-spacing:-.05pt">bonded</span><span style="letter-spacing:.95pt"> </span><span style="letter-spacing:-.05pt">contract</span><span style="letter-spacing:.95pt"> </span><span style="letter-spacing:-.05pt">and</span><span style="letter-spacing: .9pt"> </span>the<span style="letter-spacing:.9pt"> </span><span style="letter-spacing:-.05pt">Contractor</span><span style="letter-spacing: 1.0pt"> </span>shall<span style="letter-spacing:.95pt"> </span><span style="letter-spacing:-.05pt">provide</span><span style="letter-spacing:.9pt"> </span><span style="letter-spacing:-.05pt">estimates</span><span style="letter-spacing:1.2pt"> </span><span style="letter-spacing:-.05pt">per</span><span style="letter-spacing: .9pt"> </span>the<span style="letter-spacing:.9pt"> </span>TC’s<span style="letter-spacing:.9pt"> </span>to<span style="letter-spacing:1.05pt"> </span>make<span style="letter-spacing:3.85pt"> </span><span style="letter-spacing:-.05pt">additions,</span><span style="letter-spacing:1.9pt"> </span><span style="letter-spacing:-.05pt">changes,</span><span style="letter-spacing:1.9pt"> </span><span style="letter-spacing:-.05pt">and</span><span style="letter-spacing:1.9pt"> </span><span style="letter-spacing:-.05pt">renovations</span><span style="letter-spacing:1.95pt"> </span>to<span style="letter-spacing:1.9pt"> </span><span style="letter-spacing:-.05pt">various</span><span style="letter-spacing:1.9pt"> </span>SMUD<span style="letter-spacing:1.85pt"> </span><span style="letter-spacing: -.05pt">facilities</span><span style="letter-spacing:1.95pt"> </span><span style="letter-spacing:-.05pt">sites</span><span style="letter-spacing:1.9pt"> </span><span style="letter-spacing:-.05pt">and</span><span style="letter-spacing:1.9pt"> </span><span style="letter-spacing:-.05pt">buildings,</span><span style="letter-spacing: 1.9pt"> </span>including<span style="letter-spacing:5.25pt"> </span>obtaining<span style="letter-spacing:-.1pt"> </span><span style="letter-spacing:.05pt">any</span><span style="letter-spacing:-.25pt"> </span>necessary<span style="letter-spacing: -.15pt"> </span><span style="letter-spacing:-.05pt">permits.</span> </p><p class="MsoBodyText" style=" "><span style="letter-spacing: -.05pt">Except</span><span style="letter-spacing:.1pt"> </span>for <span style="letter-spacing:-.05pt">Contractor</span><span style="letter-spacing: .05pt"> </span><span style="letter-spacing:-.05pt">licensed</span><span style="letter-spacing:.05pt"> </span><span style="letter-spacing:-.05pt">design/build</span><span style="letter-spacing:.1pt"> </span><span style="letter-spacing:-.05pt">systems,</span><span style="letter-spacing:.1pt"> </span><span style="letter-spacing:-.05pt">all</span><span style="letter-spacing:.1pt"> </span><span style="letter-spacing:-.05pt">designs,</span><span style="letter-spacing:.1pt"> </span>plans,<span style="letter-spacing:.05pt"> </span><span style="letter-spacing:-.05pt">and</span><span style="letter-spacing:.1pt"> </span><span style="letter-spacing:-.05pt">specifications</span><span style="letter-spacing: .1pt"> </span>will<span style="letter-spacing:.1pt"> </span>be<span style="letter-spacing:5.35pt"> </span><span style="letter-spacing:-.05pt">prepared</span><span style="letter-spacing:.45pt"> </span><span style="letter-spacing:.1pt">by</span><span style="letter-spacing:.3pt"> </span><span style="letter-spacing:-.05pt">either</span><span style="letter-spacing:.5pt"> </span>SMUD<span style="letter-spacing:.4pt"> </span><span style="letter-spacing:-.05pt">facilities</span><span style="letter-spacing: .45pt"> </span><span style="letter-spacing:-.05pt">staff</span><span style="letter-spacing:.5pt"> </span>or<span style="letter-spacing:.5pt"> </span>SMUD<span style="letter-spacing:.4pt"> </span><span style="letter-spacing:-.05pt">contracted</span><span style="letter-spacing:.55pt"> </span><span style="letter-spacing:-.05pt">design</span><span style="letter-spacing:.55pt"> </span>professionals.<span style="letter-spacing: .95pt"> </span>The<span style="letter-spacing:3.95pt"> </span><span style="letter-spacing:-.05pt">Contractor</span><span style="letter-spacing: 2.25pt"> </span>will<span style="letter-spacing:2.3pt"> </span>be<span style="letter-spacing:2.2pt"> </span>furnished<span style="letter-spacing:2.2pt"> </span><span style="letter-spacing:-.05pt">appropriate</span><span style="letter-spacing:2.2pt"> </span>documentation<span style="letter-spacing: 2.45pt"> </span><span style="letter-spacing:-.05pt">as</span><span style="letter-spacing:2.25pt"> </span><span style="letter-spacing:-.05pt">specified</span><span style="letter-spacing:2.2pt"> </span>in<span style="letter-spacing:2.4pt"> </span><span style="letter-spacing:-.05pt">Technical</span><span style="letter-spacing:2.25pt"> </span>Conditions<span style="letter-spacing:2.85pt"> </span><span style="letter-spacing:-.05pt">(TC’s)</span><span style="letter-spacing:2.45pt"> </span>for<span style="letter-spacing:2.4pt"> </span><span style="letter-spacing: -.05pt">each</span><span style="letter-spacing:2.5pt"> </span><span style="letter-spacing:-.05pt">separate</span><span style="letter-spacing:2.45pt"> </span>task,<span style="letter-spacing:2.45pt"> </span><span style="letter-spacing: -.05pt">and</span><span style="letter-spacing:2.5pt"> </span>the<span style="letter-spacing:2.45pt"> </span><span style="letter-spacing:-.05pt">Contractor</span><span style="letter-spacing:2.45pt"> </span>will<span style="letter-spacing:2.5pt"> </span><span style="letter-spacing:-.05pt">review</span><span style="letter-spacing:2.45pt"> </span>them<span style="letter-spacing:2.5pt"> </span><span style="letter-spacing: -.05pt">with</span><span style="letter-spacing:2.5pt"> </span><span style="letter-spacing:-.05pt">SMUD’s</span><span style="letter-spacing:2.45pt"> </span>Facilities<span style="letter-spacing:3.55pt"> </span><span style="letter-spacing:-.05pt">Engineer.</span><span style="letter-spacing:1.85pt"> </span><span style="letter-spacing:.05pt">Any</span><span style="letter-spacing: .7pt"> </span><span style="letter-spacing:-.05pt">changes</span><span style="letter-spacing:1.05pt"> </span><span style="letter-spacing:-.05pt">after</span><span style="letter-spacing:.9pt"> </span><span style="letter-spacing:-.05pt">initial</span><span style="letter-spacing:.95pt"> </span><span style="letter-spacing:-.05pt">approval</span><span style="letter-spacing:.95pt"> </span>must<span style="letter-spacing:.95pt"> </span>be<span style="letter-spacing:.9pt"> </span>coordinated<span style="letter-spacing: .9pt"> </span><span style="letter-spacing:-.05pt">and</span><span style="letter-spacing:.9pt"> </span><span style="letter-spacing:-.05pt">approved</span><span style="letter-spacing:.9pt"> </span><span style="letter-spacing:.1pt">by</span><span style="letter-spacing:.55pt"> </span>SMUD<span style="letter-spacing:1.0pt"> </span>per<span style="letter-spacing:3.75pt"> </span>the<span style="letter-spacing:.3pt"> </span>TC’s<span style="letter-spacing:.35pt"> </span><span style="letter-spacing:-.05pt">before</span><span style="letter-spacing:.3pt"> </span><span style="letter-spacing:-.05pt">performing</span><span style="letter-spacing:.2pt"> </span>work.<span style="letter-spacing:.65pt"> </span><span style="letter-spacing:.05pt">Any</span><span style="letter-spacing:.1pt"> </span><span style="letter-spacing:-.05pt">required</span><span style="letter-spacing:.45pt"> </span><span style="letter-spacing:-.05pt">permits</span><span style="letter-spacing:.35pt"> </span><span style="letter-spacing:-.05pt">specific</span><span style="letter-spacing:.3pt"> </span>to<span style="letter-spacing:.35pt"> </span>the<span style="letter-spacing:.3pt"> </span>work<span style="letter-spacing:.3pt"> </span>will<span style="letter-spacing:.35pt"> </span>be<span style="letter-spacing:.5pt"> </span><span style="letter-spacing:-.05pt">held</span><span style="letter-spacing:.35pt"> </span><span style="letter-spacing:.05pt">by</span><span style="letter-spacing:.1pt"> </span>the<span style="letter-spacing:3.9pt"> </span><span style="letter-spacing:-.05pt">Contractor.</span> SMUD<span style="letter-spacing:-.05pt"> </span>will <span style="letter-spacing:-.05pt">reimburse</span><span style="letter-spacing: -.1pt"> </span>permits<span style="letter-spacing:.1pt"> </span>on a<span style="letter-spacing:-.05pt"> direct</span> pass <span style="letter-spacing: -.05pt">through.</span> </p><p class="MsoBodyText">The<span style="letter-spacing:-.1pt"> </span><span style="letter-spacing:-.05pt">following</span><span style="letter-spacing:-.15pt"> </span>is a partial<span style="letter-spacing:.05pt"> </span>list of the <span style="letter-spacing:-.05pt">various</span> <span style="letter-spacing:-.05pt">types</span><span style="letter-spacing:.1pt"> </span>of<span style="letter-spacing:-.05pt"> </span>work that will be<span style="letter-spacing:-.05pt"> </span>needed: </p><p class="MsoBodyText" align="left" style=" text-indent: -0.5in;"> i.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span> <span style="letter-spacing:-.05pt">New</span> roof <span style="letter-spacing:-.05pt">construction</span> of<span style="letter-spacing:-.05pt"> existing facilities;</span> </p><p class="MsoBodyText" align="left" style=" text-indent: -0.5in;"> ii.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span> <span style="letter-spacing:-.05pt">Removal and Replacement of existing roof</span> with like for like or another design specified material; </p><p class="MsoBodyText" align="left" style=" text-indent: -0.5in;"> iii.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span> Emergency roof repairs with-in 8 hours of request; </p><p class="MsoBodyText" align="left" style=" text-indent: -0.5in;"> iv.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span> Types of materials </p><p class="MsoBodyText" align="left" style=" text-indent: -0.25in;"> <span style="mso-bidi-font-size:12.0pt;letter-spacing:-.05pt">a.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> <span style="letter-spacing:-.05pt">Built-Up Bituminous Roofing </span></p><p class="MsoBodyText" align="left" style=" text-indent: -0.25in;"> <span style="mso-bidi-font-size:12.0pt;letter-spacing:-.05pt">b.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> <span style="letter-spacing:-.05pt">Built-Up Coal Tar Roofing </span></p><p class="MsoBodyText" align="left" style=" text-indent: -0.25in;"> <span style="mso-bidi-font-size:12.0pt;letter-spacing:-.05pt">c.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> <span style="letter-spacing:-.05pt">Single-Ply Membrane Roofing </span></p><p class="MsoBodyText" align="left" style=" text-indent: -0.25in;"> <span style="mso-bidi-font-size:12.0pt;letter-spacing:-.05pt">d.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> <span style="letter-spacing:-.05pt">Cold Applied Liquid Coating </span></p><p class="MsoBodyText" align="left" style=" text-indent: -0.25in;"> <span style="mso-bidi-font-size:12.0pt;letter-spacing:-.05pt">e.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> <span style="letter-spacing:-.05pt">Modified Bitumen Membrane Roofing </span> </p><p class="MsoBodyText" align="left" style=" text-indent: -0.25in;"> <span style="mso-bidi-font-size:12.0pt;letter-spacing:-.05pt">f.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> <span style="letter-spacing:-.05pt">Flashing and Sheet Metal</span> </p><p class="MsoBodyText" align="left" style=" text-indent: -0.25in;"> <span style="mso-bidi-font-size:12.0pt;letter-spacing:-.05pt">g.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> <span style="letter-spacing:-.05pt">PVC Systems </span></p><p class="MsoBodyText" align="left" style=" text-indent: -0.25in;"> <span style="mso-bidi-font-size:12.0pt;letter-spacing:-.05pt">h.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> <span style="letter-spacing:-.05pt">TPO Systems Coal Tar System </span></p><p class="MsoBodyText" align="left" style=" text-indent: -0.25in;"> <span style="mso-bidi-font-size:12.0pt;letter-spacing:-.05pt">i.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> <span style="letter-spacing:-.05pt">EPDM Roof System </span></p><p class="MsoBodyText" align="left" style=" text-indent: -0.25in;"> <span style="mso-bidi-font-size:12.0pt;letter-spacing:-.05pt">j.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> <span style="letter-spacing:-.05pt">Polyester Membrane System </span></p><p class="MsoBodyText" align="left" style=" text-indent: -0.25in;"> <span style="mso-bidi-font-size:12.0pt;letter-spacing:-.05pt">k.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> <span style="letter-spacing:-.05pt">Modified Bitumen Roof System </span></p><p class="MsoBodyText" align="left" style=" text-indent: -0.25in;"> <span style="mso-bidi-font-size:12.0pt;letter-spacing:-.05pt">l.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> <span style="letter-spacing:-.05pt">Asphalt Roof System </span></p><p class="MsoBodyText" align="left" style=" text-indent: -0.25in;"> <span style="mso-bidi-font-size:12.0pt;letter-spacing:-.05pt">m.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &quot;Times New Roman&quot;;"> </span></span> <span style="letter-spacing:-.05pt">Fiberglass Shingle System</span> </p><span style="font-size:10.0pt"> </span> <p class="MsoBodyText" style=" ">SMUD<span style="letter-spacing: 1.85pt"> </span>Security<span style="letter-spacing:1.65pt"> </span>will<span style="letter-spacing:2.05pt"> </span>require<span style="letter-spacing:1.8pt"> </span><span style="letter-spacing:-.05pt">background</span><span style="letter-spacing:1.95pt"> </span>checks<span style="letter-spacing:1.9pt"> </span><span style="letter-spacing:-.05pt">and</span><span style="letter-spacing: 1.9pt"> </span>badging<span style="letter-spacing:1.75pt"> </span>of<span style="letter-spacing:1.95pt"> </span>the<span style="letter-spacing:1.85pt"> </span><span style="letter-spacing:-.05pt">Contractor’s</span><span style="letter-spacing: 2.0pt"> </span>supervisory<span style="letter-spacing:2.8pt"> </span><span style="letter-spacing:-.05pt">personnel</span> <span style="letter-spacing: -.05pt">and</span> trade<span style="letter-spacing:-.05pt"> </span>workers in <span style="letter-spacing:-.05pt">critical</span> <span style="letter-spacing:-.05pt">areas</span> <span style="letter-spacing:.05pt">of</span> facilities. </p><p class="MsoBodyText">The<span style="letter-spacing:-.1pt"> </span><span style="letter-spacing:-.05pt">work</span> is further described in the <span style="letter-spacing:-.05pt">Technical</span> Conditions. </p>
Services Closed 11/16/2021 12/14/2021
Doc3246462781
BR Doc 3246462781 UNDERGROUND PULLER 4X2D
Show description Hide description
BR Doc 3246462781 UNDERGROUND PULLER 4X2D <p class="Sub-bulletCxSpFirst">DOCUMENTS FOR THIS BID REQUEST WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 11/17/2021.</p> Please click 'Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. <span style="background: yellow;">If you click respond to posting be fore the Live on Date you will receive an error.</span>
Materials Closed 11/16/2021 12/14/2021
Doc3235934466
RFP Consulting Services for Advanced Metering Infrastructure Roadmap
Show description Hide description
RFP Consulting Services for Advanced Metering Infrastructure Roadmap
Services Closed 11/11/2021 12/15/2021
Doc3254475447
RFQ Doc3254475447 ICE HOUSE RECREATION AREA IMPROVEMENTS PROJECT
Show description Hide description
<span style="font-size:12.0pt;font-family:&quot;Times New Roman&quot;,serif; mso-fareast-font-family:&quot;Times New Roman&quot;;mso-ansi-language:EN-US;mso-fareast-language: EN-US;mso-bidi-language:AR-SA">The Sacramento Municipal Utility District, hereinafter referred to as “SMUD”, is soliciting Pre- Qualification Documents (Responses) for ICE HOUSE RECREATION AREA IMPROVEMENTS PROJECT CONSTRUCTION</span>
Other Closed 11/22/2021 12/21/2021
Doc3311532943
(1) 4489P - VC3 SERVICE TRUCK 4X4G
Show description Hide description
<font size="3" face="times new roman, times, serif"> (1) 4489P - VC3 SERVICE TRUCK 4X4G - RFQ WS3311532900</font>
Materials Closed 01/04/2022 01/06/2022
Doc3200902576
Cybersecurity Services MSA RFP
Show description Hide description
<p class="Sub-bulletCxSpFirst">DOCUMENTS FOR THIS RFP WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON DECEMBER 10, 2021. </p> Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the RFP is live you will receive an error message. <p style="text-align: justify;"><span style="mso-bidi-font-size: 11.0pt; mso-fareast-font-family: Calibri;">The Sacramento Municipal Utility District (SMUD) is issuing this Request for Proposal (RFP) to establish a Master Services Agreement (MSA) for Cybersecurity Services during a period of up to five (5) years. SMUD intends to award one or more contracts to the highest evaluated proposer(s) in eight (8) functional areas (categories). Individual tasks will be utilized to authorize work as needs are identified and may be awarded to one or more Contractors at SMUD’s sole discretion. </span></p>
Services Closed 12/09/2021 01/13/2022
Doc3286411153
OFFSITE STORAGE OF HARDCOPY RECORDS AND MEDIA
Show description Hide description
The Sacramento Municipal Utility District is soliciting proposals from qualified Information Storage Service Providers to furnish off-site physical information storage and related services for boxed physical information, X-Ray film, electronic data processing media and microfilm media. Services are needed from approximately January 1, 2022, through September 30, 2027 (five years), with the option to extend the contract each year after the initial term for a maximum of three additional years (through approximately September 30, 2030).
Services Closed 12/16/2021 01/18/2022