Solicitation number | Title / Description | Category | Issued date | Closing date |
---|---|---|---|---|
Doc4704901930 |
Computer-Aided Dispatch (CAD) Solution
Show description
NOTICE: This RFP is scheduled for release on Thursday, August 1, 2024. The RFP and associated documents will be available for viewing and download after this date.
SMUD is seeking a qualified firm to provide a computer aided dispatch solution, associated implementation and integration services, and support for the solution for five (5) years.
|
IT | 07/25/2024 | 08/29/2024 |
Doc4686748826 |
GENERAL ARCHITECTURAL AND ENGINEERING SERVICES
Show description
The work to be performed under this Contract will be done at SMUD's facilities at various locations generally within Sacramento County, California. These facilities are located at the SMUD Main Campus on S Street; 59th Street Corporation Yard; Folsom Boulevard Yard Campus (located behind the S Street Campus); East Campus Operation Center (located on South Bradshaw Road); Fresh Pond facilities located east of Pollock Pines, California; Rancho Seco Complex located in Herald, California; Solano Wind Project O&M Headquarters located in Rio Vista, California; and various SMUD electrical substations and any property owned or leased by SMUD.
Each bidder is expected to visit the SMUD sites before task bidding to become thoroughly familiar with the nature and location of SMUD Facilities, the general and local conditions, including jobsite topography and ground conditions. Call the SMUD Engineer listed on the RFTP to arrange for site access necessary.
|
Services | 07/16/2024 | 08/13/2024 |
Doc4702877830 |
BR for MAC-TS4
Show description
Ordering a MAC-TS4 vacuum testing system.
DOCUMENTS FOR THIS BR WILL BE AVAILABLE ONCE THE SOLICIATION IS LIVE ON [July 25th].
Please click "Respond to Posting" and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.
|
Materials | 07/24/2024 | 08/01/2024 |
Doc4643661542 |
RFP for Street Light Installation and Maintenance Services
Show description
<strong style="background-color: rgb(255, 255, 255);">RFP for Street Light Installation and Maintenance Services.</strong>
<strong style="background-color: rgb(255, 255, 255);"> </strong>
<strong style="background-color: rgb(255, 255, 0);">Please click "Respond to Posting" and follow the instructions to log-in and register. This will provide access to the documents. If you click </strong>
<strong style="background-color: rgb(255, 255, 0);">respond to posting before the live date, you will receive an error message. </strong>
<strong style="background-color: rgb(255, 255, 0);">Live date estimated to be 7/2/24. </strong>
|
Const | 07/01/2024 | 07/29/2024 |
Doc4677714715 |
BR SWGR PDMT 21KV NOVEC 2-600A SW 2-600A
Show description
BR SWGR PDMT 21KV NOVEC 2-600A SW 2-600A
<p class="Sub-bulletCxSpFirst"> <span style="font-family:"Courier New";mso-fareast-font-family:"Courier New"">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON July 12, 2024. </p><span style="font-family: "Courier New";">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.
|
Materials | 07/09/2024 | 07/29/2024 |
Doc4621886315 |
Vegetation Management Utility Line Clearance RFP
Show description
The work generally consists of performing right-of-way maintenance work on SMUD’s Transmission and Distribution Systems on a task order basis.
This RFP will open the week on June 17, 2024. Please wait for the RFP to open to submit questions.
|
Other | 06/14/2024 | 07/26/2024 |
Doc4485717766 |
RFP for Construction Services for Renewable Assets
Show description
RFP for Construction Services for Renewable Assets
|
Materials | 06/24/2024 | 07/25/2024 |
Doc4658405845 |
CONSULTING SERVICES FOR FEDERAL DISASTER ASSISTANCE AND FEMA GRANTS
Show description
FEDERAL DISASTOR ASSISTANCE & FEMA GRANTS
Since 2018, SMUD has pursued several FEMA grant opportunities under the Hazard Mitigation Grant Program (HMGP) and the Building Resilient Infrastructure and Communities Program (BRIC). Grant applications have focused on projects to upsize culverts, reduce hazardous wildfire fuels, harden distribution line infrastructure, and prepare Local Hazard Mitigation Plans.
· UARP Culvert System Upsizing (DR4382)· Wildland Fire Mitigation through Fuels Reduction – Sacramento (DR4382)· Wildland Fire Mitigation through Fuels Reduction – El Dorado (DR4382)· PCA Fire Hardening Project (DR4407)· SMUD Microgrid Scoping (BRIC)· SMUD Local Hazard Mitigation Plan (2018)· SMUD Local Hazard Mitigation Plan (2023)
To date, SMUD staff have prepared the materials required for the above grant sub applications. In preparing the sub applications SMUD staff have worked extensively with the California Office of Emergency Services (CalOES) as well as FEMA in a variety of capacities including responding to requests for information, providing supporting documentation, and negotiating with other agencies, such as the U.S. Fish and Wildlife Service relative to meeting FEMA’s responsibilities under the National Environmental Policy Act.
This RFP is a continuation of those efforts.
|
Services | 06/27/2024 | 07/25/2024 |
Doc4585979980 |
RFP for General Line Construction and Pole Replacement Services
Show description
<span style="font-weight: bold;">RFP for General Line Construction and Pole Replacement Services.</span>
<span style="font-weight: bold;"> </span>
<strong style="background-color: rgb(255, 255, 0);">Please click "Respond to Posting" and follow instructions to log-in and register. This will provide access to the documents. If you click respond to posting before the live date, you will receive an error message. Live date estimated to be 6/12/24.</strong>
|
Const | 06/12/2024 | 07/18/2024 |
Doc4653178660 |
BR TRANSFORMER BUSHINGS 230KV and 69KV
Show description
BR TRANSFORMER BUSHINGS 230KV and 69KV
<p class="Sub-bulletCxSpFirst"> <span style="font-family:"Courier New";mso-fareast-font-family:"Courier New"">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 6/27/2024. </p><span style="font-family: "Courier New";">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.’
|
Materials | 06/25/2024 | 07/16/2024 |
Doc4651126766 |
RFP Transmission and Substation Steel Contract
Show description
RFP Transmission and Substation Steel Contract
<p class="Sub-bulletCxSpFirst"> <span style="font-family:"Courier New";mso-fareast-font-family:"Courier New"">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 6/24/2024.</p><span style="font-family: "Courier New";">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.
|
Other | 06/24/2024 | 07/16/2024 |
Doc4563653337 |
RFP for Cable Replacement Construction Services
Show description
<p class="MsoBodyText" style=" ">The Contractor shall furnish all supervision, labor, equipment and incidentals necessary to accomplish the work in accordance with the Contract.<span style="mso-spacerun:yes"> </span>The Contractor shall employ personnel that can use circuit prints to install conduit according to SMUD job design. The work generally consists of: </p>
<p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt "Times New Roman""> </span></span></span> Earthsaw/Rocksaw excavation in either concrete or asphalt pavement. </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt "Times New Roman""> </span></span></span> Installation of PVC Conduit. </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt "Times New Roman""> </span></span></span> Backfill, compaction, slurry/concrete, and repaving. </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt "Times New Roman""> </span></span></span> Tunnel notches. </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt "Times New Roman""> </span></span></span> Excavation of intercept | tie in | conduit pits and installation of pull boxes (concrete/horticultural, lawn and cultivated areas) </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt "Times New Roman""> </span></span></span> Grinding asphalt pavement in compliance with the applicable local agency specifications where work is to be performed. </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt "Times New Roman""> </span></span></span> Trench excavation. </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt "Times New Roman""> </span></span></span> Roadway resurfacing. </p><p class="MsoBodyTextFirstIndent" style=" text-indent:-.25in; mso-list:l0 level1 lfo1;tab-stops:list .75in"> <span style="font-family:Symbol;mso-fareast-font-family:Symbol;mso-bidi-font-family: Symbol"><span style="mso-list:Ignore">·<span style="font:7.0pt "Times New Roman""> </span></span></span> Boring horizontal holes in various types of earth formations, such as, sand, rock, clay, hardpan, loam, etc. </p>
<p class="MsoBodyTextFirstIndent" style="text-align:justify;text-indent:0in">The work on this contract consists of numerous individual jobs, which will be assigned as the need arises.<span style="mso-spacerun:yes"> </span>Work will be Task Released to the Contractor and assigned in the form of a "Purchase Order (PO)â€.<span style="mso-spacerun:yes"> </span>Each PO will be a separate/complete project.<span style="mso-spacerun:yes"> </span>The Contractor shall complete each PO before physical construction (breaking ground) on another PO, unless approved by the Contract Manager. </p>
<p class="MsoBodyTextFirstIndent" style="text-align:justify;text-indent:0in">The intent of these specifications is to describe the work and to provide appropriate pay items.<span style="mso-spacerun:yes"> </span>Some of the items and quantities in the Bid Schedule may not be utilized.<span style="mso-spacerun:yes"> </span>Others may only be partially used or may be exceeded.<span style="mso-spacerun:yes"> </span>No adjustment of unit prices will be made for under-runs or over-runs of the quantities listed in the Bid Schedule.<strong style="mso-bidi-font-weight:normal"> </strong></p>
<strong style="background-color: rgb(255, 255, 0);">Please click "Respond to Posting" and follow instructions to log-in and register. This will provide access to the documents. If you click respond to posting before the Live date, you will receive an error message. </strong>
<strong style="background-color: rgb(255, 255, 0);"> </strong>
<span style="font-weight: bold; background-color: rgb(255, 255, 16);">NOTE: Documents for this RFP will be available once the solicitation is live. Estimated to be 5/24/24. </span>
|
Services | 05/22/2024 | 07/15/2024 |
Doc4601524833 |
WORKER'S COMPENSATION THIRD PARTY CLAIMS ADMINISTRATION SERVICES
Show description
SMUD is seeking a qualified Claim Service Provider to provide complete WC TPA services. SMUD is looking for a TPA partnership that will deliver objective and measurable results that will reduce the cost and duration of WC claims, provide claims processing in a timely and professional manner, actively pursue subrogation and insurance recovery, assist in returning injured employees back to work, and maintain strong communications with the injured worker and SMUD.SMUD intends to award one contract commencing January 1, 2025, for a five (5) year period with two 1-year options to extend for services described in this Request for Proposal.
|
Services | 05/23/2024 | 07/12/2024 |
Doc4641921285 |
UARP Reservoir Bathymetric Surveys
Show description
Sacramento Municipal Utility District owns and operates the reservoirs listed below. The reservoirs are formed by dams and used for hydroelectric power generation. SMUD calculates the amount of water in storage for a variety of operational and regulatory requirements by measuring the water surface elevation. An important parameter in this calculation is the relationship between contents and water surface elevation. To this end, SMUD requires surveys of the bathymetry of these reservoirs. These reservoirs are in the Sierra Nevada, El Dorado County, California, west of Lake Tahoe, on the American River watershed. All have boat ramps and are accessible year-round using paved or well-graded gravel roads. Each boat ramp, with one exception, is publicly accessible over US Forest Service or county roads. Reservoirs are generally held nearly full year-round. They are long and narrow, at the bottom of canyons. Attachment 1 has sketch maps of each reservoir, with UTM grid location, a scale bar, and symbols identifying the dam and boat ramp.SMUD calculated bathymetry when designing the dams forming these reservoirs. SMUD made bathymetric measurements and calculations in 1999, and at two of the reservoirs, additional bathymetric measurements.
|
Other | 06/18/2024 | 07/11/2024 |
Doc4641888603 |
BR for Needlepoint Bipolar Ionization System
Show description
BR for Needlepoint Bipolar Ionization System
<span class="ui-provider a b c d e f g h i j k l m n o p q r s t u v w x y z ab ac ae af ag ah ai aj ak"><ul><li>DOCUMENTS FOR THIS BR WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON June 21, 2024. ‘ </li><li>‘Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting be fore the Live on Date you will receive an error.’</li></ul></span>
|
Materials | 06/21/2024 | 07/02/2024 |
Doc4580729117 | Const | 05/10/2024 | 06/28/2024 | |
Doc4612220459 |
RFI - DISTRIBUTIONS TRANSFORMERS
Show description
RFI - DISTRIBUTIONS TRANSFORMERS
<p style=" ">The Sacramento Municipal Utility District (“SMUDâ€) is seeking information from suppliers on their processes, capabilities, and approaches to manufacturing and providing Distribution Transformers. SMUD hopes to gather information from, build relationships with, and potentially enter into agreements with suppliers such that it can increase the resiliency of its electric grid in the face of severe weather events. The questions included in the RFI will help SMUD understand the existing processes, capabilities, and constraints of Distribution Transformer manufactures and suppliers. </p>
|
Materials | 05/30/2024 | 06/21/2024 |
Doc4575183223 |
RFP Wood Cross Arms
Show description
RFP Wood Cross Arms
<p class="Sub-bulletCxSpFirst" style="mso-list:l0 level2 lfo1"><span style="font-family:"Courier New";mso-fareast-font-family:"Courier New""><span style="mso-list:Ignore">o<span style="font:7.0pt "Times New Roman""> </span></span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 05/13/2024. </p>
<p class="Sub-bulletCxSpLast" style="mso-list:l0 level2 lfo1"><span style="font-family: "Courier New";">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.</p>
|
Materials | 05/07/2024 | 06/21/2024 |
Doc4612227198 |
BR S and C Circuit Switchers
Show description
BR S and C Circuit Switchers
<p class="Sub-bulletCxSpFirst" style="mso-list:l0 level2 lfo1"> <span style="font-family:"Courier New";mso-fareast-font-family:"Courier New""><span style="mso-list:Ignore">o<span style="font:7.0pt "Times New Roman""> </span></span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 6/3/2024. <span style="mso-spacerun:yes"> </span></p>
<p class="Sub-bulletCxSpLast" style="mso-list:l0 level2 lfo1"><span style="font-family: "Courier New";">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.’ <span style="background:yellow; mso-highlight:yellow"> </span></p>
|
Materials | 05/30/2024 | 06/20/2024 |
Doc4565097955 |
BR for Mobile Surveillance Trailers
Show description
Purchase of (2) mobile surveillance trailers for IT PMO. See technical specs for detailed information.
<span class="NormalTextRun SCXW134609168 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">DOCUMENTS FOR THIS RF</span><span class="NormalTextRun SCXW134609168 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">x</span><span class="NormalTextRun SCXW134609168 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;"> WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 5/15/2024</span>
<span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">Please</span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;"> click </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">‘</span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">Respond to Posting</span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">’</span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;"> </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">and</span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;"> </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">follow instructions to login and register. This will provide </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">access </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">to </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">the documents.</span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;"> </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">If you click respond to posting </span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;">before</span><span class="NormalTextRun SCXW193584825 BCX0" style=" padding: 0px; user-select: text; -webkit-user-drag: none; -webkit-tap-highlight-color: transparent; font-family: Calibri, Calibri_EmbeddedFont, Calibri_MSFontService, sans-serif; font-size: 14.6667px; font-variant-ligatures: none; white-space-collapse: preserve;"> the Live on Date you will receive an error.</span>
|
Materials | 05/01/2024 | 06/14/2024 |
Doc4510063265 |
Integrated Vegetation Management
Show description
Request for Proposals for Integrated Vegetation Management
<p class="Sub-bulletCxSpFirst"><strong>DOCUMENTS FOR THIS RFP WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON OR ABOUT MAY 16, 2024</strong></p>
Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.
|
Other | 05/12/2024 | 06/13/2024 |
Doc4608600199 |
NETWORK TRANSFORMERS
Show description
REQUEST FOR QUALIFICATIONS NETWORK TRANSFORMERS
THIS SOLICITATION WILL BE AVAILABLE WHEN IT IS LIVE ON WEDNESDAY, MAY 29, 2024 @ 8AM.
RESPONSES WILL NOT BE ACCEPTED THROUGH EVENT MESSAGES OR EMAIL.
|
Materials | 05/28/2024 | 06/06/2024 |
Doc4563832831 |
Strategic Planning and Visualization Software Tool and Implementation Services
Show description
NOTE: THIS RFP HAS A TENTATIVE POSTING DATE OF MAY 3RD, 2024. THE RFP AND ASSOCIATED DOCUMENTS WILL BE AVAILABLE AFTER RELEASE.
SMUD requires a strategic portfolio management tool that aligns with its vision to foster strategy development and visualization, coupled with dynamic portfolio analysis to aid executive decision-making. The selected software will offer an intuitive and comprehensive platform that supports the analysis, interpretation, and display of complex data, enabling strategic insights to be effectively communicated across the organization.
Resulting Contract Term: 5 Years
Contract Administrator: Austin Svien
|
Other | 04/30/2024 | 05/31/2024 |
Doc4547003978 |
INTEGRATED DISTRIBUTED RESOURCE PLAN CONSULTING SERVICES
Show description
SMUD is looking for a consultant to support our development of an Integrated Distributed Resource Plan (IDRP) by the end of 2024. The IDRP will assess the impact and system needs for the distribution system of implementing SMUD’s Integrated Resource Plan (IRP) and the expected levels of Distribution Energy Resources (DERs) that will impact our system in the 2025-2035 period.
We are looking for a technical consultant with extensive experience in DER technologies, DER modeling, and that possess knowledge of California and federal policy applicable to DERs and municipal utilities. The study should cover the following key technologies: Energy Efficiency (EE), Demand Response (DR), Behind-the-meter (BTM) Solar PV; Electric Vehicles (EVs), BTM Storage, EV Charging stations, Heat pump water heaters, and Heat pump space heaters.
|
Services | 04/19/2024 | 05/29/2024 |
Doc4556833991 |
INVENTORY CONTRACT FOR 12KV & 21KV CUTOUTS
Show description
BR INVENTORY CONTRACT FOR 12KV & 21KV CUTOUTS
<p class="Sub-bulletCxSpFirst"> <span style="font-family:"Courier New";mso-fareast-font-family:"Courier New"">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 04/29/2024. </p><span style="font-family: "Courier New";">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span></span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.’
|
Materials | 04/25/2024 | 05/28/2024 |
Doc4530795758 |
SWITCHGEAR VAULT 21KV NOVEC 4-WAY WITH SCADA
Show description
BR SWITCHGEAR VAULT 21KV NOVEC 4-WAY WITH SCADA
<p class="Sub-bulletCxSpFirst"> <span style="font-family:"Courier New";mso-fareast-font-family:"Courier New"">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON April 12, 2024. </p><span style="font-family: "Courier New";">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span></span>Please click Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.
|
Materials | 04/10/2024 | 05/24/2024 |
Doc4512407737 |
RFP Inventory Wood Utility Pole
Show description
RFP Inventory Wood Utility Pole
<p class="Sub-bulletCxSpFirst" style="mso-list:l0 level2 lfo1"> <span style="font-family:"Courier New";mso-fareast-font-family:"Courier New""><span style="mso-list:Ignore">o<span style="font:7.0pt "Times New Roman""> </span></span></span>DOCUMENTS FOR THIS RFP WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 04/01/2024.<span style="mso-spacerun:yes"> </span> </p><p class="Sub-bulletCxSpLast" style="mso-list:l0 level2 lfo1"><span style="font-family: "Courier New";">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.’ </p>
|
Materials | 03/28/2024 | 05/24/2024 |
Doc4567369323 |
STEEL POLE CORROISION INSPECTION SERVICES
Show description
The Sacramento Municipal Utility District (SMUD) is implementing a two year inspection and testing service Contract to support corrosion mitigation work on transmission line (TL) painted steel poles. SMUD has selected up to 14 transmission line painted steel poles with nominal operational line voltages of 115 and 230 kilo-Volt (kV) to be re-coated within the term of this 2 year contract.
|
Services | 05/02/2024 | 05/23/2024 |
Doc4563500198 |
RFP for GREENHOUSE GAS SCOPE 3 EMISSIONS VERIFICATION SERVICES
Show description
<p style="mso- mso- text-align:justify">SMUD is soliciting proposals for verification services of scope 3 greenhouse gas (GHG) emissions for three (3) reporting years, for calendar years 2022, 2023 and 2024. Services are sought from a Verification Body to complete verification of SMUD’s GHG reporting consistent with a CDP (formerly known as the Carbon Disclosure Project) accepted verification standard.<a target="_blank" target="_blank" href="file:///K:/Teila%20Roberts/4%20-%20Solicitations/In%20progress/RFP_GREENHOUSE%20GAS%20SCOPE%203%20EMISSIONS%20VERIFICATION%20SERVICES/FINAL%20RFP%20Greenhouse%20Gas%20Scope%20Verification%20Services_SCS%204.10%20(002).docx#_ftn1"><span class="MsoFootnoteReference"> <span class="MsoFootnoteReference"><span style="font-size:12.0pt;mso-bidi-font-size: 10.0pt;font-family:"Times New Roman",serif;mso-fareast-font-family:"Times New Roman"; mso-ansi-language:EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">[1]</span></span> </span></a> </p><div>
<div> <p class="MsoFootnoteText"><a target="_blank" target="_blank" href="file:///K:/Teila%20Roberts/4%20-%20Solicitations/In%20progress/RFP_GREENHOUSE%20GAS%20SCOPE%203%20EMISSIONS%20VERIFICATION%20SERVICES/FINAL%20RFP%20Greenhouse%20Gas%20Scope%20Verification%20Services_SCS%204.10%20(002).docx#_ftnref1"><span class="MsoFootnoteReference"> <span class="MsoFootnoteReference"><span style="font-size:12.0pt;mso-bidi-font-size:10.0pt;font-family:"Times New Roman",serif; mso-fareast-font-family:"Times New Roman";mso-ansi-language:EN-US;mso-fareast-language: EN-US;mso-bidi-language:AR-SA">[1]</span></span> </span></a> List of accepted CDP standards can be found in the following CDP site: <a target="_blank" href="https://www.cdp.net/en/guidance/verification#d8add324c80c222f9a6153bc6c76e12c">https://www.cdp.net/en/guidance/verification#d8add324c80c222f9a6153bc6c76e12c</a> </p> </div></div>
|
Services | 04/30/2024 | 05/22/2024 |
Doc4545051294 |
BR Inventory 21kV Line Break Switches
Show description
BR Inventory 21kV Line Break Switches
<span style="font-family: "Courier New";">o<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span></span>DOCUMENTS FOR THIS RFx WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON 4/22/2024.
<span style="font-size:11.0pt;line-height:115%;font-family:"Calibri",sans-serif; mso-ascii-theme-font:minor-latin;mso-fareast-font-family:Calibri;mso-fareast-theme-font: minor-latin;mso-hansi-theme-font:minor-latin;mso-bidi-font-family:Arial; mso-bidi-theme-font:minor-bidi;mso-ansi-language:EN-US;mso-fareast-language: EN-US;mso-bidi-language:AR-SA"><span style="font-family: "Courier New"; font-size: 11px;">o</span><span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.</span>
|
Materials | 04/18/2024 | 05/14/2024 |
Doc4554886431 |
MICRO FOCUS UNIFIED FUNCTIONAL TESTING (UFT) AND APPLICATION LIFECYCLE MANAGEMENT MAINTENANCE (ALM) MAINTENANCE AND SUPPORT
Show description
The Sacramento Municipal Utility District (SMUD) is soliciting bids for Micro Focus Unified Functional Testing (UFT) and Application Lifecycle Management Maintenance (ALM) and Support for a 5-year term with the option to extend for two (2) additional one-year terms thereafter.
|
Other | 04/24/2024 | 05/08/2024 |
Doc4407380073 |
Camino Generator 1 Rehabilitaion RFP
Show description
<p class="Sub-bulletCxSpFirst" style="mso-list:l0 level2 lfo1"> <strong><span style="font-family:"Courier New";mso-fareast-font-family:"Courier New""><span style="mso-list:Ignore">o<span style="font-style: normal; font-variant: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: "Times New Roman";"> </span></span></span>DOCUMENTS FOR THIS RFP WILL BE AVAILABLE ONCE THE SOLICITATION IS LIVE ON OR ABOUT JANUARY 29, 2024</strong></p>
<p class="Sub-bulletCxSpLast" style="mso-list:l0 level2 lfo1"> <span style="font-family:"Courier New";mso-fareast-font-family:"Courier New"; background:yellow;mso-highlight:yellow"><span style="mso-list:Ignore">o </span></span>Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting before the Live on Date you will receive an error.</p>
|
Materials | 01/22/2024 | 05/03/2024 |
Doc4093798372 |
RFP for Generation, Distribution and Transmission Power Transformers
Show description
<strong>RFP for Generation, Distribution and Transmission Power Transformers </strong>
<span style="font-size:11.0pt;line-height:115%; font-family:"Calibri",sans-serif;mso-ascii-theme-font:minor-latin;mso-fareast-font-family: Calibri;mso-fareast-theme-font:minor-latin;mso-hansi-theme-font:minor-latin; mso-bidi-font-family:Arial;mso-bidi-theme-font:minor-bidi;mso-ansi-language: EN-US;mso-fareast-language:EN-US;mso-bidi-language:AR-SA">Please click ‘Respond to Posting’ and follow instructions to login and register. This will provide access to the documents. If you click respond to posting be fore the Live on Date you will receive an error.</span>
|
Materials | 07/13/2023 | 10/23/2023 |
Doc4171885766 |
AERIAL PHOTOGRAPHY SERVICES
Show description
This project will utilize drones to obtain high-definition 100-megapixel photos of all components of approximately 1500 transmission structures within Sacramento County, and a portion of South Placer County. The photos will be taken from multiple angles, multiple elevations, and focus on insulators, connectors, splices, structure body and other components. The drones will also take photos of surrounding terrain and transmission structure footings and Right-of-Way (ROW). Additionally, the contractor will submit to SMUD Contract Manager and third-party reviewer all high-resolution images in electronic format with metadata in a SMUD defined file naming convention.
|
Other | 08/30/2023 | 09/21/2023 |
Doc4102512538 |
IFB FOR 59TH STREET DEMOLITION SERVICES - PHASE 2
Show description
<p class="MsoBodyText" style=" tab-stops:1.0in"><span style="font-size: small; font-family: arial, helvetica, sans-serif;">SMUD is seeking qualified Contractors to provide Site and building demolition of SMUD’s previous corporation yard which is approximately 16 acres on the north side of the light rail tracks and 4 acres which are south of the light rail tracks. Multiple buildings are on each location and the site work generally includes demolition of parking lot lights, loading ramps, equipment racks, tall concrete curbs, and misc. site structures such as a wood chip bin and covered material bins. </span></p><span style="font-size: small; font-family: arial, helvetica, sans-serif;">
</span><span style="font-size: small; font-family: arial, helvetica, sans-serif;">Services are needed by approximately November 1, 2023, and the resulting contract will run for approximately 1 year. </span>
<span style="font-size: small; font-family: arial, helvetica, sans-serif;">
</span><span style="font-size: small; font-family: arial, helvetica, sans-serif;">SMUD intends to award one contract to the lowest evaluated Bidder as a result of this solicitation. </span>
<span style="font-size: small; font-family: arial, helvetica, sans-serif;">
</span><span style="font-size: small; font-family: arial, helvetica, sans-serif;">The Prime Bidder must demonstrate in their bid that they meet the following PASS/FAIL requirement. Failure to meet this requirement will result in SMUD declaring the Bid non-responsive. </span>
<p class="MsoListParagraph" style="text-indent:-.25in;mso-list:l0 level1 lfo1"><span style="font-size: small; font-family: arial, helvetica, sans-serif;"> A.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;"> </span> Prime Bidder must attend the mandatory Pre-Bid Conference and site visit to ensure a complete understanding of the details of this Invitation for Bid. Attendance will be verified by the Pre-Bid Conference sign-in sheet. </span></p><p class="MsoBodyText" style=" text-indent:-.25in;mso-list:l0 level1 lfo1"><span style="font-size: small; font-family: arial, helvetica, sans-serif;"> B.<span style="font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-stretch: normal; line-height: normal;"> </span> Contractor must possess a current California Contractor’s License in ALL of the following classes: The general contractor will have an A, C21 and C22 licenses at the time of bid. </span></p><span style="font-family: arial, helvetica, sans-serif;">
<span style="background-color: rgb(255, 255, 46);"> <strong><span style="font-size: 12pt;">*DOCUMENTS WILL BE AVAILABLE FOR DOWNLOAD ON AUGUST 24, 2023 after 3PM PST*</span></strong></span><span style="font-size: 12pt;"><span style="background-color: rgb(255, 255, 46);"> </span>
<strong>PLEASE CLICK 'RESPOND TO POSTING' AND FOLLOW INSTRUCTIONS TO LOGIN AND REGISTER. THIS WILL PROVIDE ACCESS TO THE DOCUMENTS.</strong></span></span>
<table width="100%" cellspacing="0" cellpadding="0" border="0" style="font-family: "72", Arial, Helvetica, sans-serif; color: rgb(102, 102, 102); font-size: 14px; font-weight: 700;"> <tr> <td class="postingSummaryItemPadding" style="color: rgb(0, 0, 0); font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-weight: normal; font-stretch: normal; line-height: normal; padding-bottom: 5px;"><font size="2">https://discovery.ariba.com/rfx/16990325</font></td> </tr> </table>
|
Services | 08/23/2023 | 09/19/2023 |
Doc4167980300 |
4721U - VO9 CHIPPER TOWABLE
Show description
This solicitation will be available on Tuesday, August 29, 2023.
Responses will not be accepted through event messages or email.
|
Services | 08/28/2023 | 09/15/2023 |
Doc4169354299 |
4722U - VO9 CHIPPER TOWABLE
Show description
4722U - VO9 CHIPPER TOWABLE
Reponses will not be accepted through event messages or email.
|
Services | 08/29/2023 | 09/15/2023 |
Doc4087506649 |
RFP for Substation Construction Services
Show description
This RFP solicits proposals for Substation Construction Services from Contractors pre-qualified through RFQ No. Doc4026185446.
<strong><span style="background-color: rgb(255, 255, 0);">Please click "Respond to Posting" and follow instructions to log-in and register. This will provide access to the documents. If you click "Respond to Posting" before the live date, you will receive an error message.</span></strong>
<span style="font-weight: bold; background-color: rgb(255, 255, 0);"><span style="text-decoration-line: underline;">NOTE</span>: Documents for this RFP will be available once the solicitation is live. Estimated to be 7/11/23.</span>
|
Services | 07/06/2023 | 09/08/2023 |